My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4309 CRESCENT AVE 2018-01-02 MF Import
>
Address Records
>
CRESCENT AVE
>
4309
>
4309 CRESCENT AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2022 3:01:23 PM
Creation date
2/12/2017 1:08:00 AM
Metadata
Fields
Template:
Address Document
Street Name
CRESCENT AVE
Street Number
4309
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LE; ' ' li ment <br /> _IU1 Utilities Division,PublicWorks 3200 CedarDepart Street <br /> COST ESTIMATE SHEET ? I9g8 Everett,Washington 98201 <br /> (425)257-8800 <br /> CITY EVERPTi <br /> Receipt # ;!� 7c�� ngineerir",g/p lblic Services —fJ <br /> Date Paid <br /> X Cost of Work Order 3,511.00 Work Order # <br /> Cost of Service Order Service Order# <br /> Contact Person a McKee_) Telephone # 425-485-4911 <br /> Requested By everno Const. Date of Request 4-16-98 <br /> Property Owner(name) <br /> Charge Cost to (name if different than owner) <br /> Address 16212 Bothell Way SE City— Mill Creek Zip 98012 <br /> Installation Location 4300 BIk Crescent Ave <br /> Installation type/description/size/etc. Hydrant install. Expose 4" main in Crescent. Hot tap, install 4x6 <br /> increaser, control valve & box, 10' (±) DI pipe and hydrant. Backfill and restore. <br /> ® The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br /> restoration, and final hook-up. <br /> 0 The following estimate is based upon the Street Division work group providing all labor,equipment, materials <br /> and restoration to property. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation date <br /> to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and the owner <br /> thereof,and provided further,that any excess payment shall be returned to the person applying for the installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> cc: Bldg.Permit Center <br /> Clair Olivers <br /> Labor&Benefits 1,080.00 Tom Thetford <br /> Material 1,937.00 Kirk Brooks <br /> Gordon Witcher <br /> Equipment Rental 494.00 Dan Lowell <br /> Stan Mitchell <br /> Surface Restoration <br /> Paul McKee <br /> TOTAL $3,511.00 Gerry Crum <br /> Alan Locke <br /> Prepared by: Gairry Cru Date Est. <br /> Accepted by: �� Prepared: Representing: <br /> 4-17-98 <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> CGSTAGND:GC36 cst(LM4/I7/98) <br />
The URL can be used to link to this page
Your browser does not support the video tag.