My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3600 CRESWELL RD LINE 3 2016-01-01 MF Import
>
Address Records
>
CRESWELL RD
>
3600
>
LINE 3
>
3600 CRESWELL RD LINE 3 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 1:22:23 AM
Creation date
2/12/2017 1:22:20 AM
Metadata
Fields
Template:
Address Document
Street Name
CRESWELL RD
Street Number
3600
Tenant Name
LINE 3
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Department <br /> Utilities Division <br /> COST ESTIMATE SHEET ��-i � � -ly yII 3200 Cedar Street <br /> TO POSTING � Everett,Was6ingtoo98201 <br /> (206)259-8800 I <br /> i <br /> Receipt # Datc Paid � <br /> X Cost of VJork Order $11,088.90 Work Ordcr k l <br /> Cost of Service Order Servicc Ordcr# � <br /> Contact Pcrson Telephone # _ j <br /> Requcsted By Ken Howe Date of Request 8-16-95 <br /> Property Owner(name) Butte�eld <br /> Charge Cost to(name if different than owncr) Snohomish County PUD- Barbarn Smith <br /> Address 2320 California City Everett Zip 98206 <br /> Installation Location Butterfield - Group B 2-3-4 Row-Cresswell Rd. <br /> Installation n�pc/description/sizc/ctc. 8" hot tap on #3 transmission line, install 80' (± ) S"pipe, reduce to 2" <br /> and install 2" metered service. Restore urea. <br /> � The follo�cing estimate is 61sed upon the Utilities Division providing all labor,equipment, materials, <br /> restoration,and final hook-up. <br /> � The follo�ving estimate is based upon the Street Division work group providing all labor. _quipment, <br /> materials and res[oration ro property. <br /> Whene�•er the estimated cost is not sufficient la co��er the total expcnse for labor, material, equipment rental and <br /> administrati��c costs, thc deficit shnll bc charged to thc praperty for which such instnllation N•as made and the owncr <br /> thcrcof,and prorided furtheq thnl any exccss pnymen[shall bc returncd to thc person appl�'ing for the installetion. <br /> Itemized Cost Estimate: <br /> cc: Bldg. Pemiit Center <br /> Clair Olivers <br /> Labor& Benefits 53,172.50 Tom Thetford <br /> 5,134.52 Kirk erooks <br /> I�laterial Gordon N'itchcr <br /> Gquipmen[ Rental _ 1,970.00 Dan Lo��cli <br /> Stan Mitchcll <br /> Surface Restoration --- Paul McRee <br /> Gerry Crum <br /> Sales Ta� g>>•g8 <br /> '�'OTAL S11,088.90 <br /> Prcparcd by: Gem'Crun <br /> "-� Date Est. <br /> Accepted by: L'fS�23LC�; Represcntinc: <br /> 9-6-95 <br /> Fcr�n�nTF GnOD FOR 6 MONTHS <br /> t05 f AGSO Cd"�C51 LL�F�'e<� <br />
The URL can be used to link to this page
Your browser does not support the video tag.