Laserfiche WebLink
Page z <br /> Work Activity Work Urder o9�11,2ooZ 9:48 <br /> Work Order Number 20020621 <br /> EQUIPMENT: <br /> ID DESCRIPTION Date Units Cost <br /> MATERIAL: Sub Total <br /> ID DESCRIPTION Date Units Cost <br /> BRIC00061156 BRICK,2-114 X 4 X B GREY CONC 04/04I2002 26.00 55.72 <br /> CEME00061438 CEMENT 20 MINUTE SET 50 LB.BA 04l04I2002 2,00 $23.67 <br /> PIPE46304347 PIPE 8 PVC SEWER ASTMD-3034 80 04/0312002 130.00 �274.43 <br /> PIPE46304347 PIPE 8 PVC SEWER AS'MD•3034 BO 04I0412002 19.00 $40 <br /> MISCELLANEOUS: Sub Total �•93 <br /> ID DESCRIPTION Date Units Cost <br /> Sub Total �•� <br />