Laserfiche WebLink
PUBLIC WORKS PERMIl' COMMENTS <br /> 4. As per Public Works approved plan dated <br /> ��� Connect side sewer per City Standard #601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a root downspout infiltration system per City of Eve�ett <br /> Slorm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br /> attachment for more details. <br /> �"^ <br /> 10 The contractor must meet with the Public Work,> Inspector to discuss potential drainage <br /> routing prior to beginning the project ��' � �2 U(ac•-5 ��i��- , <br /> �11. Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parceis <br /> �3. ) Remove erosion control measures upon completion of the project prior to final approval of the <br /> / permit. <br /> 14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gulter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public�Vorks Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of �verett Standard #307. <br /> 17. Pave driveway from the front property line out to ihe street paving. <br /> C8.� Contact the 'eU Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for lhe parking �rea. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge inio a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements off1FDA <br /> Standards 13D. <br /> �:,c,,,,,.�s /� <br /> (�1'� <br /> �� <br />