My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4708 DOGWOOD DR 2018-01-02 MF Import
>
Address Records
>
DOGWOOD DR
>
4708
>
4708 DOGWOOD DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 9:01:46 AM
Creation date
2/12/2017 3:16:39 AM
Metadata
Fields
Template:
Address Document
Street Name
DOGWOOD DR
Street Number
4708
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chopelas & Associates, Inc. <br />TNEngineering & Design Services <br />3611 168' St. NE, Suite 5 <br />Arlington, WA 98223 <br />(360) 653-4615; FAX: (360) 651-2085 <br />March 7, 2002 <br />Deaconess Children's Services <br />4708 Dogwood Avenue <br />Everett, WA 98203 <br />Subject: Entry Bridge for the office building at the above address <br />A structural steel bridge with a concrete deck has been designed to permanently rcplacc the :ailing <br />wooden entry bridge at the above office. It should provide decades worth of very low maintenance <br />service. Mounting details allow it to be supported by the sidewalk and building at each end. Analysis <br />indicated some simple reinforcement of the building is necessary to carry the bridge's design loads. <br />The attached analysis is done in compliance with the 1997 UBC. The following design loads were used <br />based on the site conditions or according to the minimum code requirements: <br />Design wind speed: 80 MPI4 <br />Wind exposure: B <br />Seismic Zone 3 <br />Deck load: 100 PSF (exit facilities) <br />All dimensions should be field verified and parts made to fit the existing structure. Ovcra'', dimensions <br />may vary up to three ;aches as long as none of the relationships between the structural details is altered. <br />The bridge can be fabricated off -site and crane installed. The steel ledgers should be fabricated first and <br />installed, and then the bridge assembly can be accurately positioned and the girders match drilled for a <br />perfect fit. <br />If you have any questions or if you are in need of further assistance please feel free to call. <br />C <br />WAS WO <br />�1 h *X1 <br />ch <br />r: <br />R. 27974 <br />Stt)NAL3� 1°Z <br />EXFiEFS 12-]4-Zoo <br />Peter Chopelas PE <br />
The URL can be used to link to this page
Your browser does not support the video tag.