Laserfiche WebLink
/ <br />CLOSED CM WORK ORDERS REPORT <br />Total iJtility Maintenance Management System <br />07/11/1995 Dage 1 <br />-------------------------------------------------------------------_____''_______ <br />Date Range :O1/09/1989 - 07/OG/1995 <br />CM Work Order Range :1001091070001 - UT2G08- - Pattern :710119G750261 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />----------------------------------------------------------------=--------------- <br />CM WORK ORDER ID: 710119G7502G1 Title: CONVERT 5122 DOGWOOD n(�� <br />« DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS3694Z033 -- WATER SERVICE <br />Loration ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: OG/29/1995 <br />Overall Craft: <br />Issued: 06/22/1995 <br />out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name <br />UL ;;SJ <br />WST WDT <br />Materials: <br />ID <br />ADAP34000547 <br />BOX000056247 <br />COUP34004647 <br />COUP341.42747 <br />ELIA34101447 <br />ELIA34104247 <br />METE36089447 <br />PIPE34060647 <br />VALV34097448 <br />Issued by <br />Priority: <br />SMITH, STEVE J. <br />WALDEN, DAROLD T. <br />WMI9 Assigned to: <br />Travel Time: 0.00 Hr. <br />Description <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />BOX DIETER PLA 15" X 10" i9/LID <br />COUPLING 3/4" ANG MET X FIP @ <br />COUPLING 3/4" CTS COMP X MIPT@ <br />ELL 3/4" 90 DEG BRASS ' <br />ELL 3/4" STREET BRASS " <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />PIPE 3/4" POLY I.P.S. <br />VALVE ANGLE CHECK 3/4" @ <br />Planned Hrs Actual Hrs <br />----------- ---------- <br />0.00 4.00 <br />0.00 4.00 <br />Total Labor Cost: <br />Date � IIsed <br />06/29/1995 <br />O6/28/1995 <br />OG/29/1995 <br />OG/29/19a5 <br />OG/29/1995 <br />06/29/1995 <br />OG/29/1995 <br />OG/29/1995 <br />OG/29/1995 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />3 <br />1 <br />Cost <br />60.12 <br />80.32 <br />140.44 <br />Cost <br />31.64 <br />12.94 <br />4.58 <br />5.36 <br />1.31 <br />1.73 <br />30.99 <br />0.78 <br />11.86 <br />Total Material Cost: 101.19 <br />Vehicles: <br />ID Description Hours Cost <br />------------ ------------------------------ ------ ---------- <br />V2117 91 CHEV 1-TON HYD UNIT 4.00 22.40 <br />Total Vehicle Cost: 22.40 <br />Work Description: <br />---------------------------- <br />METER# 40635666 <br />