Laserfiche WebLink
� TO PQ��'��?�;APR 1 8 1991 �,� <br />CL088D CM WOR1C ORDERB REPORT <br />Total Utility Maintenance Management System <br />02/24/1997 Page 1 <br />Date Rangs :O1/09/1989 - 02/07/1997 <br />CM Work Order Range :1001091070001 - 8409501080001Pattern :7101196649182 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program �LL Function ALL Activity ALL <br />________________________________________________________________________________ <br />CM WORTt ORDER ID: 7101196649182 Title: SO 1 INCH 204 DORN AVE (A & B) <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 119 Activity 664 <br />Date Completed: 02/07/1997 <br />Overall Craft: <br />Issued: 11/13/1996 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL CSG <br />WST LDS <br />UL MME <br />WST WDT <br />SUP1 WMW <br />Materials: <br />ID <br />ADAP36001247 <br />BOX000065547 <br />CORP36002247 <br />ELL036144047 <br />METE36089247 <br />N/A <br />PIPF.36060747 <br />SADD44016847 <br />SETT36033547 <br />vehiclas: <br />ID <br />V2117 <br />V2119 <br />VH0003 <br />VT0007 <br />Issued by: GJ Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />CAVANAH� SHANE G. <br />LOFLING, DELMAR S. <br />MURRAY, MATHEW E. <br />WALDEN, DAROLD T. <br />WARD, MICHAEL W. <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />O.OQ <br />Description <br />------------------------------ <br />ADAPTER 1" MIP X INSTA-TITE @ <br />BOX METER CONC W/STEEL LID <br />CORP STOP 1" CCT X INSTA-TITE@ <br />ELL 1" 90 DEG STREET BRASS " <br />METER 1" NEPTUNE T-10 <br />TRACE WIRE <br />PIPE 1" POLY I.P.S. <br />SERVICE SADDLE 6" W/3/4" CCT <br />SETTER COP 1" (H15") <br />Description <br />91 CHEV 1-TON HYD UNIT <br />91 CHEV 5 YD <br />94 CAT BACKHOE <br />94 ATLAS COMPCO COMP. <br />Actual Hrs <br />9.00 <br />9.00 <br />2.00 <br />8.50 <br />1.00 <br />Total Labor Cost: <br />Cost <br />121.32 <br />196.29 <br />25.66 <br />179.27 <br />22.56 <br />5�:5.10 <br />Date # Used Cost <br />-------- -------- ---------- <br />02/03/1997 1 11.90 <br />02/03/1997 1 41.14 <br />02/03/1997 1 25.61 <br />02/03/199i 1 2.71 <br />02/03/1997 1 82.79 <br />02/03/1997 �f--- - -3 74' <br />02/03/1997 34 13.26 <br />02/03/1997 1 10.55 <br />02/03/1997 1 93.38 <br />Total Material Cost: <br />Hours <br />9.00 <br />7.00 <br />7.00 <br />7.00 <br />Total Vehicle Cost: <br />Cost <br />47.70 <br />75.60 <br />169.40 <br />34.3U <br />327.00 <br />285.0 <br />ast���l � <br />