Laserfiche WebLink
�'_�STING ! �� S�, k'_ <br />cr.ossn cx xoxx oxnrxs xaeoxm <br />Total Utility Maintenance Management System <br />07/09/1996 Page 1 <br />------------------------------------------- --- --- <br />Date Ranqe :O1/09/1989 - 07/O1/1996 <br />CNt Work Order Range :1001091070001 - UT1002- - Pattern :7101196648933 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Prugram ALL Function ALL Activity ALL <br />------------------------------------------------------------------------- -- <br />CM WORK ORDER ID: 7101196648933 Title: SO 1 INCH 212 DORN AVE <br />«DUPLIC?.TE PRINTING OF THIS WORK ORDER» <br />Item ID: -- <br />Location ID: -- <br />Proqram 710 Function 119 Activity 664 <br />Date Completed: 06/17/1996 • <br />Overall Craft: <br />Issued: 06/03/1996 <br />Out of Service? NO <br />Meter Readinq: <br />Downtime: 0 hours <br />status: <br />issued by: Assiqned to: <br />Priority: Travel Time: 0.00 Hr. <br />Labor: <br />Craft ID Name <br />----- ------ -----------�------ <br />UL GDJ GOSS, DANNY JAMES <br />WST LDS LOFLING, DELMAR S. <br />UL SSJ SMITH, STEVE J. <br />WST A'DT WALDEN, DAROLD T. <br />![aterials: <br />ID <br />ADAP36001247 <br />BOX000056047 <br />CORP36002247 <br />�LL036144047 <br />METE36089247 <br />N/A <br />N/A <br />PIPE36060747 <br />SADD44017047 <br />WIREOU119847 <br />Vehicles: <br />ID <br />Description <br />------------------------------ <br />ADAPTER 1° MIP X INST.�.-TITE @ <br />BOX METER PLA 13" X 20° W/LID <br />CORP STOP 1" CCT X INSTA-TITE@ <br />ELL 1n 90 DEG STREET BRASS ^ <br />METER 1° NEPTUNE T-10 <br />ASPHALT (ASSOC) <br />C.D.F. (ASSOC) <br />PIPE 1" POLT I.P.S. <br />SERVICE SADDL� 6" W/1" CCT <br />TRACING WIRE 10 GAUGE <br />Description <br />94 CAT BACKHOE <br />Planned Hrs Actual Hrs Cost <br />----------- ---------- �--------- <br />0.00 3.00 38.19 <br />0.00 2.00 41.28 <br />0.00 3.00 44.73 <br />0.00 3.00 59.76 <br />Total Labor Cost: 183.96 <br />Date i� Used Cost <br />-------- -------- ---------- <br />06/18/1996 1 11.48 <br />06/18/1996 1 20.63 <br />06/18/1996 1 24.09 <br />06/18/1996 1 2.98 <br />06/18/1996 1 82.66 <br />06/19/1996 1 .06 <br />06/22/1996 1 26.98 <br />06/18/1996 37 14.80 <br />06/18/1996 1 11.54 <br />06/18/1996 38 4.18 <br />Total Material Cost: 298.40 <br />� I a1o.0+i <br />Hours __ Cost___ ( �a . � <br />3.00 83.70 <br />Tota1 Vehicle Cost: 83.70 <br />