Laserfiche WebLink
- ��9ST��lf I � 5 `f� <br />cLossn cx woxx oxn�s xspoirr <br />Total Utility Maintenance Management System pgge 1 <br />07/09/1996 <br />Date Range :01/09/1989 - 07/O1/1996 <br />CM Work Order Range :1001091070001 - UT1002- - Pattern :7101196648934 <br />Item 'Range :<Blank> - WW22o20001 Pattern <* <br />Program ALL Function ALL Activity ALL ______ <br />CM WORK ORDER ID: 7101196648934 `Title: SO 1 INCH 216 DORN AVE <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: " <br />Location ID: " <br />Proqram 710 Function 119 <br />Date Completed: 06/14/1496 <br />Overall Craft: <br />Issued: 06/03/1996 <br />out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name <br />UL GDJ <br />UL SSJ <br />WST TDE1 <br />WST WDT <br />Itaterials: <br />ID <br />ADAP36001247 <br />BOX000056047 <br />CORP36002247 <br />ELL036144047 <br />METE36089247 <br />N/A <br />PIPE36060747 <br />SADD44017047 <br />SETT36033547 <br />Vehicles: <br />ID <br />V2117 <br />VH0003 <br />Issued by: <br />Priority: <br />GOSS, DANNY JAMES <br />SMITH, STEVE J. <br />THOMPSON, DWAYNE E. <br />WALDEN, DAROLD T. <br />Description <br />ActiVity 664 <br />Assigned to: <br />Travel Time: 0.00 Hr. <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />ADAPTER 1° MIP X INSTA-TITE @ <br />BOX METER PLA 13° X 20" W/LID <br />CORP STOP 1n CCT X INSTA-TITE@ <br />ELL 1" 90 DEG STREET BRASS ^ <br />METER 1" NEPTUNE T-10 ASSOC) <br />C.D.F. � <br />PZPE 1° POLY Z.P.S. <br />SERVICE SADDLE 6" W/1" CCT n <br />SETTER COP 1n (H15 ) <br />Description <br />91 CHE�1 1-TON HYD UNIT <br />94 CAT BACKHOE <br />Actual Ars <br />4.00 <br />4.00 <br />4.00 <br />4.0� <br />Total Labor Cost: <br />Date ,} Used <br />Cost <br />-----50.92 <br />59.64 <br />68.96 <br />79.68 <br />`---259.20 <br />Cost <br />06/14/1996 1 11.48 <br />06/14/1996 1 20.63 <br />06/14/1996 1 24.09 <br />06/14/1996 1 2.98 <br />06/14/1996 1 82.66 <br />06/21/1996 1 6.97 <br />06/14/19 6 37 14.80 <br />06/14/1996 1 11.54 <br />06/14/1996 1 _____96_89 <br />Total Material Cost: <br />Hours <br />4.00 <br />4.00 <br />Total Vehicle Cost: <br />Cost <br />---~_22.40 <br />111.60 <br />134.00 <br />y92.04 <br />— a�,9� <br />aco5',o7 <br />