Laserfiche WebLink
� � 8 19A7 <br />TO POSTING � -- <br />CLOBBD CM 1fOR1C ORD$RB REPORT <br />' Total Utility Maintenance Management System page 1 <br />12/05/1996 <br />Date Range :01/09/1989 - 11/27/1996 <br />CM Work Order Range :1001091070001 - UT2600-02- Pattern :*101196649181 <br />Item Ranqe :<Blank> - WP122020001 <br />Program ALL Function ALL Activity ALL_____________________________________ <br />CM WORK ORDE:t ZD: 7101196649181 Title: SO 1 INCH 228 DORN AVE (A & B) <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: " <br />Location ID: -' Activity 664 <br />Program 710 Function 119 <br />Date Completed: 06/15/1996 <br />Overall Craft: <br />Issued: 11/13/1996 <br />Out of Service? NO <br />Meter Reading: <br />Dowritime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL SSJ <br />WST TDE1 <br />WST WDT <br />1[at�rials: <br />ID <br />ADAP36001247 <br />BOX000050447 <br />CORP36002247 <br />ELL036144047 <br />METE36089447 <br />N/A <br />N/A <br />PIPE36060747 <br />SADD44017047 <br />SETT36033547 <br />vehiclea: <br />ID <br />V2117 <br />V2231 <br />VH0003 <br />VT0007 <br />Issued by: Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />SMITH, STEVE J. <br />THOMPSON, DWAYNE <br />WALDEN, DAROLD T. <br />Planned Hrs Actual Hrs Cost <br />---------- <br />---------- ------- <br />------------- ' 0.00 4.00 61.24 <br />E. 0.00 4.00 70.80 <br />0.00 4.00 81.80 <br />Total Labor Cost: 213.84 <br />Description <br />------------------------------ <br />ADAPTER 1" MIP X INSTA-TITE @ <br />BOX METER PLA (EXT) 15" X 10" <br />CORP STOP 1" CCT X INSTA-TITE@ <br />ELL 1" 90 DEG STREET BRASS <br />METER 5/8" X 3/4° NEPTUNE T-10 <br />C.D.F. (ASSOC) <br />TRACING WIRE <br />PIPE 1" POLY I.P.S. <br />SERVICE SADDLE 6" W/1" CCH15") <br />SETTER COP 1" � <br />Description <br />---------------------- <br />91 CHEV 1-TON HYD UNIT <br />90 FORD DUMP 5-YARD <br />94 CAT BACKHOE <br />94 ATLAS COMPCO COMP. <br />Date � Used Cost <br />-------- -------- ---------- <br />06/14/1996 1 11.90 <br />06/14/1996 1 7.52 <br />06/14/1996 1 25.61 <br />06/14/1996 1 2.71 <br />06/14/1996 1 30.67 <br />06/14/1996 26.9 <br />06/14/1996 38 -�-18 <br />06/14/1996 37 14.43 <br />06/14/1996 1 11.54 <br />06/14/1996 1 ____ 93_38 <br />Total Material Cost: _ 31; 5 <br />�— <br />xours cost �97� 7� <br />------ ---------- <br />4.00 22.40 <br />4.00 44.40 <br />4.00 111.60 <br />4.00 28.40 <br />Total Vehicle Cost: 206.80 <br />