Laserfiche WebLink
Work Sheet: SCPA Question <br />Date: March 10'�' 2Q05 <br />Address: 229 Uorn Ave �+,verctt, WA 98208 <br />Owner: Bonterr� Homes, LLC <br />Builder: Ashbyrn Townhomes, LLC <br />1litigation of Advcrsc impacts by SGPA <br />l. As the project starts to develop Ashbyrn I_LC will not impact any of thc <br />surroimding propertics. Please sec detail for cicaring limits. <br />2. Nc have a contract with thc school district. 'I'he "I'raftic Mitigation is a one timc <br />�ce for all thc homcs of $4819.00. \�l�e hnve given Ste��c L'agleUy a copy of this <br />contract. <br />3. Plcasc rc:id commcnts abo��c. <br />[nform;itiun Tor Dcvcloper: <br />L Ashbym LLC is submitting full scts of Civil and Architcctural ���orking dra��incs. <br />�. The Civil dra�ving has a 1'ull page of detail for pom Ave. improvement. <br />3. l�he parking on this project meets the Cily zoning codes with the exception of thr <br />south entry. The hvo parking slalls were allowed to save somc large trees on the <br />southc�ut of thc projcct. Pcr my convcrsation with thc city thc)' wcrc going to <br />allow thc t�vo stalls in licu of taking lhc trces out. <br />�3. Plcase sce commcnt #l. <br />j. Please see attached letter �vritten to Rick Robinson on 1-12-05. <br />6. '1'he water and sewer fees will be pnid. <br />7. Thc Civil dnwing is completc and bcing submittcd today. <br />S. Plcase see comment f�om Rick IZoUison # 26. The distance irom the hydrant is on <br />the plans. Plcase see the Gont page. <br />9. L3eing this project is an infill Ashbyrn LLC and Bonterra tlomes LLC �vill keep <br />the streets cican during construction.l'hc site �vill be pa��ed as soon as we cmi. <br />�� <br />��3 <br />