My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4621 DOVER ST 2016-01-01 MF Import
>
Address Records
>
DOVER ST
>
4621
>
4621 DOVER ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 12:50:27 PM
Creation date
2/12/2017 3:40:50 AM
Metadata
Fields
Template:
Address Document
Street Name
DOVER ST
Street Number
4621
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />PUBLIC WORKS PERMIT COMMENTS <br />Connect side sewer per City Standard �/&01. <br />Connect side sewer per City Standard #'s 601, 602, 604. <br />Connect all rooRop downspouts to the side sewer. <br />Connect rooftop downspouts to the drainage system provided for th�s lot. <br />Rooftop runoff must be discharged to a roof downspout infiltratlon system per City of Everett Storm <br />Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for <br />more details. <br />� The cuntractor must meet with the Public Works Inspector to discuss <br />beginning the project. Call Randv Allen at 425-339-7403 // Call Cliff I <br />10. <br />11. <br />routing prior to <br />Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br />bales, swales, or erosion blankets. <br />Install erosion control measures per City of Everett Standards for smail parcels <br />12. Remove erosion control measures upon completion of the project prior to final approv�l of the permit. <br />�All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br />permitted site. No wasting of mater�al is allowed on this building lot. <br />141 No dirt, mud, rocks or debris to be tracked onto roadway. <br />15. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and <br />open for pedestrian travel. <br />16. Adjust water meter box 1" above sidewalk grade. <br />17. Remcve and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A & 306 on <br />this proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />18. <br />19. <br />20. <br />Install a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway from the front property line out to the street paving. <br />Pave to existing paving in alley. <br />21. Contact the _ <br />sewer services. <br />�:Nater District for connecting provisions for this building's water and <br />22. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is required for the <br />parking area. <br />23. If a sewer pump system is to be installed, the pressure line must discharge into a priva?e manhole, then <br />gravity flow across the public right-of-way. <br />24. A sprinkler system is required for this building in compliance with the requirements of NFPA Standards <br />13D. <br />PWComments I Revised 618111 Z�Z <br />! <br />
The URL can be used to link to this page
Your browser does not support the video tag.