Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />O1/27/1997 Page 1 <br />Date Range :01/09/1989 - 01/10/1997 <br />CM Work Order Range :1001091070001 - UT2600-02- Pattern :7101196750970 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101196750970 Title: CONVERT 4908 DOVER ST <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: WS3594S005 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 01/10/1997 <br />Overall Craft: <br />Issued: 12/20/1996 Issued by: WMW Assigned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />----- ------ <br />Name <br />------------------------------ <br />Planned Hrs <br />Actual Hrs <br />Cost <br />EO CCL <br />CRAIG, CHESTER L. <br />----------- <br />0.00 <br />---------- <br />3.00 <br />---------- <br />58.74 <br />UL MME <br />MURRAY, MATHEW E. <br />0.00 <br />3.00 <br />38.49 <br />Total Labor Cost: <br />97.23 <br />Materials: <br />ID <br />------------ <br />Description <br />----------•-------------------- <br />Date <br /># Used <br />Cost <br />ADAP34000547 <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />-------- <br />01/10/1997 <br />-------- <br />3 <br />---------- <br />25.02 <br />ADAP34000647 <br />ADAPTER 3/4" FIP X INSTA-TITE@ <br />01/10/1997 <br />1 <br />7.41 <br />BOXO00056247 <br />BOX METER PLA 15" X 10" W/LID <br />O1/10/1997 <br />1 <br />12.90 <br />ELLO34104247 <br />ELL 3/4" 90 DEG STREET BRASS <br />01/10/1997 <br />2 <br />3.02 <br />METE36089447 <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />01/10/1997 <br />1 <br />30.67 <br />PIPE34060647 <br />PIPE 3/4" POLY I.P.S. <br />01/10/1997 <br />1 <br />0.23 <br />SETT34149747 <br />SETTER COP 5/8" X 3/4" (H7") <br />01/10/1997 <br />1 <br />38.56 <br />Total Material <br />Cost: <br />117.81 <br />Vehicles: <br />ID <br />------------ <br />Description <br />------------------------------ <br />Hours <br />Cost <br />V2146 <br />87 CHEV 1 TON W/HYD. UNIT <br />------ <br />3.00 <br />---------- <br />14.40 <br />Total Vehicle Cost: <br />14.40 <br />Work Description: <br />-------------------------------------------------------------------------------- <br />METER #4190R458 <br />Total cost for work order 7101196750970: 229.44 <br />