Laserfiche WebLink
everett <br />� <br />INSPEGTION REPORT <br />Address .S�Z�_��� <br />Contractor ��_��,i� / <br />Owner � �yr� <br />Date �r ��' <br />TYPE UF INSPECTION REQU[STED <br />' BLDG: Pmt. No. <br />'. MECH: Pmt. No. <br />p > <br />XELEC: Pm�. No. /J �� 9 ' PLBG: Pmt. No. __ <br />�,p-,.4'emp, Elect. ❑ Framing ❑ Gas Piping <br />'[TFooting ❑ Crywall, Nailing u Consultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Duciwork ❑ Grid ❑ Struct. Slab <br />� Wood Stove C Rnugh-In p Fi <br />� Masonry �Service ❑ �� <br />J�APPROVAL ❑ PARTIAL APPRO AL <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />i Corrections listed below MUST B� MADE belore v,�ork can bc approved. <br />❑ Please contact inspector and arrange for appointment. <br />G Was not able to pertorm inspection. <br />❑ CALL 259•d810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BL ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />� <br />Inspeclor <br />� <br />