Laserfiche WebLink
everett <br />� <br />INSPECTION REPORT <br />Address ��� � �� <br />Contractor � � � <br />Owner ���� <br />Date _—����� <br />iYPE OF INSPECTION REOUESTED <br />�:.9LDG: Pmt. No. I�0 MECH: PmL No. <br />f 1 ELEC: Pmt. No. <br />❑ Teinp. Elect. <br />❑ Footing <br />❑ Foundalion <br />❑ Duclwork <br />❑ Wood Stove <br />❑ Masonry <br />❑ APPROVAL <br />❑ VIOLATION <br />❑ PLBG: PmL No. <br />,�.�raming ❑ Gas Piping <br />O Drywall, Nailing ❑ Consultalion <br />❑ Shear Nailing ❑ Groundwork <br />❑ Grid ❑ Strucl Slab <br />❑ Rough-In ❑ Final <br />❑ Service � <br />PARTIAL APPROVAL <br />CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE betore work can be approved. <br />❑ Please contact inspector and arrange tor appointment. <br />❑ Was not able to periorm inspection. <br />�ALL 259•8810 FOR REINSPECTION — 24 hour notice required. <br />q" CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />6,r,-c�;,. , <br />Inspeclor _ <br />� <br />. � `,.`- ' <br />7-/S-8� <br />