Laserfiche WebLink
(� <br />� <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />� Connect side sewer per City Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />/ 8.l Connect rooftop downspouts to the drainage system provided for this lot. <br />U <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _ <br />10. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />11. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's irontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />12. Install a Type I concrete driveway per City of Everett Standard #.307. <br />�13 Pave driveway from the front property line out to the street paving. <br />14. Contact the ,_. Water District for connecting provisions for this buiiding's <br />water and �eNer services. <br />15. If a setiver pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity ilow across the public right-of-way. <br />16. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the projec,. <br />17. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />� <br />/aLL G—�C�Vb.�� P-( �k�-=� i,�L F"PE�r� l=G�U�uDAT7oA <br />5� 0�c<�/-1C.K,�021 �'e�c.�:r-� �Kf�t.0 i3C Ha-tt1Li�1� To �4N <br />�l'i'2Lv�-v .JE,zil�;rl� J �i� No ;.u.�-s,—e��vc� OP �i191L��.¢L <br />o n -{-�u �3vi��N�j �C.D % , <br />r��} <br />awcxnmenn <br />+ <br />