Laserfiche WebLink
3 <br />�I,pSED � WORK ORDERS g�pORT <br />Total Utility Maintenance Management system <br />06/06/1994 Page 1 <br />__�_�_____��_�_____________s======s <br />_________�__________________________�_______ <br />Date Ranqe :05/O1/1992 - 05/31/1994 <br />CM Work Order Ranqe :<Blank> ' 8405421080Z2g pattern ;�401196750870 <br />Item Range :<Blank> - WW22020001 pattern ;* <br />Proqram ALL Function ALL Activity ALL ________________ <br />----- ---- <br />a�ssaaav:acec=�cas�=v=Cce=escec�===�=eo==�o'cs-'o�o-c�----�e����_________- <br />CM WORK ORDER ID� 7401196750870 T;t1e:.CONVERT 5809 EAST DR <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS0685E057 -- WATER SERVICE <br />Location ID: -- <br />Proqram 740 Function 119 Activity 675 <br />Date Complated: 05/27/1994 <br />Overall Craft: <br />Iseued: 05/20/..994 <br />out of Service? No <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />WST MKC <br />UL TDEl <br />Materials: <br />ID <br />ADAP34000547 <br />ADAP34000647 <br />BOX000056247 <br />COUP34004647 <br />ELIA34104247 <br />METE36089447 <br />SETT34033647 <br />Name <br />Issued by: SKL Assigned to: NSO <br />Priority: Travel Time: 0.00 Hr. <br />----------------- <br />MOORE, KIM C. <br />THOMPSON, DWAYNE E. <br />Planned Hrs <br />0.00 <br />0.00 <br />Description <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />ADAPTER 3/4" FIP X INSTA-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 3/4" ANG MET X FIP @ <br />ELL 3/4" STREET SRASS � <br />METER 5/8" * NO REMOTE READER <br />SETTER COP 5j8" X 3/4" LGTH15" <br />Vehicles: <br />Ip Description <br />------------ ------------- <br />V2117 CHEV 1 TON '91 <br />Work Description: <br />-------------------------------------------- <br />METER� 11542 <br />Total cost for work order 7401196750870: <br />Actual Hrs <br />3.00 <br />3.00 <br />Total Labor Cost: <br />Date <br />05/27/1994 <br />05/27/1994 <br />05/27/1994 <br />05/27/1994 <br />05/27/1994 <br />05/27/1994 <br />05/27/1994 <br />Total Material Cost: <br />Date Hours <br />05/27/1994 3.00 <br />Total Vehicle Cost: <br />Cost <br />59.19 <br />41.04 <br />100.23 <br />Cost <br />-----32.20 <br />13.38 <br />13.49 <br />4.27 <br />4.14 <br />27.21 <br />47.78 <br />142.47 <br />Cost <br />17.40 <br />17.40 <br />260.10 <br />