Laserfiche WebLink
� <br />� <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />� Connect side sewer per City Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />(o" L'C-tr'Yl/t�� i"D /3wy <br />8. Connect rooftop downspouts to th� drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _ <br />10. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />11. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />8 306 on this proposal's frontage as directed by the Publi� Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be rap a�ed). <br />12. Install a Type I concrete driveway per City of Everett Standard #307. <br />' 13; Pave drivewEy from the front property line out to the street paving. <br />14. Gontact the Water District for connecting provisions for this building's <br />water and sewer services. <br />15. If a sewer pump system is to be installed, the pressure �:ne must discharge into a p-:✓ate <br />manhole, tnen gravity flow across the public right-of-way. <br />�The contractor must meet with the Public Works Inspector to discuss potential dra�nage <br />routing prior to beginning the project. "�i�LA� N�i C r�c (C�j �� <br />17. A sprinkler system is required for thic ;,�ilding in compliance with the requirements of NFDA <br />Standards 13D. <br />PWCanments <br />�1 S�a�l. A I�-" � c;�/Z' f'/�L ✓ �t1 D E� D(�L✓E�'J+ul <br />��v t.,� GZ=iZ S l��U-�� - Ci-1"ll7IC G I=6/L '.lf4Tl=�' (�l"-�• j U <br />� n��,-r A��. c�- ,,��� c �� z_ ��t:_ ;,� o¢t. r <br />