My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2102 EL CAPITAN WAY 2016-01-01 MF Import
>
Address Records
>
EL CAPITAN WAY
>
2102
>
2102 EL CAPITAN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 6:12:47 AM
Creation date
2/12/2017 6:11:54 AM
Metadata
Fields
Template:
Address Document
Street Name
EL CAPITAN WAY
Street Number
2102
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• vegetated swale. The other two units will be used as bypass pumps to route all flows above the <br /> two year storm around the swale and into the City's storm sewer. All four pumps will have <br /> identical ratings and power requirements. Bio5ltration will occur in a 162 foot long "emergent <br /> swale," and wi1 provide for a 5 minute residence time as mandated by City standards. The site <br /> hydrogaphs, detention vault design, and swale design calculations can be found in Appendix A of <br /> the supplementsil report. <br /> �hannel Chanae:�,: <br /> No channel changes will be required. <br /> ^ l,,u verts: <br /> An 8'x 10'reinforced concrete single box culvert will be installed for this project to act as a <br /> detention vault for srormwater runoff. Both ends of the culve,rt will be sealed, and a pump station <br /> installed to drain the v�ult. The vault will be located from "L"Line Sta. 2+09.5(27'Lt)to Sta. <br /> 1+19.5(2T Lt). <br /> � Pitches: <br /> No ditches witl be cons:ructed on this project. <br /> Enciosed Draina¢e: <br /> The enclosed drainage system designed for the original Hydrautics Report will not be modified in <br /> this supplement except for the addition of 6" dia. underdrain pipe being added for the swale. In <br /> addition, a portion of the proposed storm sewer from "L" Gne Sta. 2+09.5 to Sta. 1+20.5 will be <br /> removed to construct the detention vault. <br /> Gutter Desi¢n: <br /> Will not be altered from the approved Hydraulic Report. <br /> Retention Ponds: <br /> Retention/detention ponds will not be provided for on this project. . <br /> 3 <br /> _.. .. . _ �' <br />
The URL can be used to link to this page
Your browser does not support the video tag.