Laserfiche WebLink
1 up passengers and exit to this particular area here. ' <br /> z There will be a traffic light in that area. <br /> 3 This Park and Ride lot will accommodate 464 <br /> 4 parking stalls. Zn this area oJe would have sidewalks, <br /> 5 retaining walls, rockery walls. And all these green <br /> 6 areas between the parking stalls will be landscapinq <br />�' � . Site No. 1, which is located near 527 near <br />; <br />•. 8 Eastmont Interchanqe, which is the preferred <br /> f 9 alternative for Washington State Department of <br /> 10 Transportation, we have SR 527 . We have E1 Capitan <br /> ; 11 Way. We have Mercant Way and Meadow Way. We have the <br /> i 1z detention pond, if you looked on the slide. We have <br />�� 13 the Bingo hall located here, and we have the <br /> 14 commercial building where the two Department of <br /> 15 Transportation project office is located. <br /> ' 16 The main traffic wil <br /> 1 come aff of 527 an E1 • <br /> 17 Capitan Way and enter here and <br />' pick up passengers <br />� 18 along this area where the concrete pads are and <br /> 19 shelters and exit on E1 Ca . ' <br /> pitan Way here where the <br />� ZO traffic liqht will be constructed. <br /> Z1 NoW, the first phase of cons�ruction will be <br /> zz 401 parkinq stalls will be located in this area right <br /> 23 here. The second phase of construction would be in I <br /> Z4 this area right here, and a tFird phase would be in II <br /> ZS the commercial buildinq around the eingo hall there. <br /> 8 <br /> CENTRAL COURT REPORTING <br /> (205) 747-3016 <br /> i . -, . <br /> �� <br /> i,:'�, <br /> ;;�°i <br />