Laserfiche WebLink
. <br /> 1 use agreement. �� <br /> Z In other sections of the document you referred <br /> 3 to a short-term lease or a short-term use agreement, <br /> 4 but you use conflicting language throughout the <br /> 5 document, and we're concerned witl�. precisely what � 20 <br /> 6 you're talkinq about in terms of lenqth and what <br /> 7 constitutes short-term and the like. If we could get <br /> 8 a clarification on that issue, we�d very much <br /> 9 appreciate it. <br /> 10 Another question we have, on paqe 7 there's a <br /> 11 qeneral comment saying that ��If Site 1 is selected, <br /> 12 Stage 2 construction, " which required the takinq of <br /> 13 our client�s building, the Binqo hall, "Would begin <br /> 14 when the Stage 1 facility is near capacity. �� <br /> 15 In other words, you are goinq to qo in and take <br /> 16 a portion of this property and dedicate it tc the Park <br /> 17 and Ride in the first stage. And as I understand it <br /> 18 that's up to 600 stalls. And then when that is full, <br /> . 19 then you would proceed with the second stage. <br /> 20 Z was wondering if you could clarify for us the <br /> 21 time period, if you predict that time period, it would <br /> 22 take for Staqe 1 to be at full capacity. I think that <br /> 23 does naed to be clarified and I think there are 21 <br /> 24 resources available to you to identify what that would <br /> 25 be. <br /> 16 <br /> CENTRAL COURT REPORTING <br /> ' (206) 747-3016 <br />