Laserfiche WebLink
. .. - ' � , . . :�-ti`E -1iSs .. .,. . <br /> • • j � @ � � w � ° <br /> �- COMPUANCE <br /> �. REOUIRED � <br /> INSPECiION �MPORTANT: Please su I Infortnatlon In the shaded boxes and check the a ro rlate <br /> APPROVED PP Y PP P <br /> � circles. Disregard toplcs that don't descrlbe your bullding or equlpment.p.Q�t place <br /> checks In the two left columns. <br /> ' � � ' �� <br /> ❑ ❑ QQ Exterior slab Insulation, ii not located on the interior, shall be R-10 (Table 6-2). <br /> p p Di Exterior slab Insulation, if present, shall approved tor below grade use and protected above grade. <br /> p ❑ 2e Walls, including rim joists, shali be insulated wiibout �rompression to jTable 6-2}: ' <br /> �R-15 batt (Opiions I,il) �R-19 (Optioh ili, IV,V, VI,VII) <br /> ❑ ❑ Qlnterfor below grade watls shali be insulated without comptession to (Table 6•2): ; <br /> �R-15 (Options l;tl} �R-19(Options111;iV, V.VI;UIIj <br /> ❑ ❑ QVaulted ceilings'shali be insulated without compressinn tolR-30(Table 6-2, All options) <br /> p ❑ Qi Skyllght wall Insulatlon is instailed and equivalent to the reG::�red wall R-values above. <br /> p ❑ Q Vapor retarders shail be installed loward the warm surface as represented below (502J.6): : <br /> Seiect one option for iloors, walis,and appropriate ceilih�s <br /> Fioors: "�,Plywood W/ cxterioc giue �Poly (a 4 Miq L) Backed batts <br /> Wails: Poty pfastic(z 4 Mil) � Face-stapled, hacked batts ' Q PVA paint <br /> Ceilings: Not required whe�e ventiiatioa space averages>i2"above insutation. <br /> �Face stapled backedbatts QPoly plastio (a 4 mii) Q PVA p�int <br /> ❑ ❑ �Heating system eHiclency and sizing reqwrements shal�be met as represented below: <br /> ❑ ❑ Heat Pump eHiciency shsil be met er.derthe following complfance path (S. 503.4)`. <br /> � Split system, alr rouroe heat pump:HSPF 2 6.8, CUP>3A <br /> Q Single packa9e, air source heat pump: NSPF a 6.6, COP > 3A <br /> Q Waler source heat pump:COP a 3.8 <br /> (� Ground source heat pump COP a 3A <br /> p ❑ Os Central force•alr furnace AFUE rating, as listed in the GAMA Directory, shall be: <br /> C�a ,78 iOptions I, �I, IV,VI,VII) � � .88 (Option III}) �z.74 (Option V) <br /> ❑ ❑ s Non-central,combustion heating sysiems shali have intermitent ignition <br /> O ❑ � Maximum heating system output t150°l0 of desic�n heat ioad) is 4� e� BTUfir. (S. 5f'3.22) <br /> ❑ ❑ �a Hlgh eificlency torced•alr furnece (s 56,000 BTUlhr.output)may may exceed 150°ioot DHl <br /> berause: QGAMA listed AFUE is� 78 + t per each 5000 RTUfhr output lhat it exceeds the DHL. <br /> WSEC Insulation phase requirernents: <br /> Inspected by: _Date <br /> _ <br /> ��.�. , <br /> ❑ ❑ Q Envelope Floors shall be insulated without compression, and with support s z4"D.C.to: ' , <br /> 'QR19 (Options I, II, ill, IV, V) Q H25 (Options Vl, Vii) ` , <br /> p � �a Non•vaulted,attic cellings shall he insulated without compre�sion to: See Table 6•2 <br /> ��i .R-30 {Options I, II, III, IV, V, VII) �R�B (Option VI) �--..-'..----� <br /> • ❑ � �i Door systems shall meet:Q�U.40 (All opt�ons) <br /> Doortypesare (i)!"� �,_..r,.,,- ,�_ _L(2) ' .__�.. � .,,. j�= ���3� <br /> ,_, ,> — <br /> Pac�e 5 of 6 <br />