Laserfiche WebLink
COMPLIANCE <br />REQUIRED V <br />n <br />R■ <br />■❑ <br />A <br />L■7 <br />0 <br />r <br />INSPECTION <br />APPROVED IMPORTANT: Supply information in the shaded area by checking the appropriate circles. <br />Disregard topics that don't descrita your building or equipment. DONOI place checks In <br />the two left columns. <br />❑ t_ J Slab Insulation (Table 6.2) shall be R•10 and located on the <br />(DA.. Exterior (See INSULATION INSPECTION). <br />OR <br />�DB. Interior extending downward from the top slab surface to Its undersurfa0e and <br />horizontally under the stab for a total distance of 24", or vertically 24". <br />❑ z Radiant Slab Insulation (S. 502.1.4.9) shall be R-10 and extend underthe entire slab <br />❑ s Below grade masonry wall !nsulation (S. 502-1A.10) shall be full -depth and located on the,: <br />CA. Exterior and rated R-10,(See1NSULATION PHASE). <br />OR <br />�CB, 1nten'cr (See INSULATION PHASE) <br />❑ Q Thermal break(s) shall be placed in the slab (S. 502,1,4.8,201.1: BUILDING ENVELOPE) <br />between the conditioned and unconditioned spaces checked below, and extend from the top of the <br />slab to the bottom, then underneath toward the conditioned space for a 24". <br />0dwelling/garage :, 0 dwelling/connected space Q. slab edge and foundation wall..' <br />❑ D Radon Requirements (VIAQ, S. 502.1) shall be met it = of the following Is checked: <br />Q A. Net foundation ventilation area is less than t FT2 per 300 F12 of crawl space <br />0 B. Foundation vents are closable. ' <br />fl C Crawl space acts as a supply, or return air plenum. <br />c <br />WSEC Foundation phase requirements: <br />Inspected by: rl,#, <br />��F�IAMlNG PH,gSE � " ; <br />❑ structural panels such 6 All stras plywood, oriented strand board, particle board, and wafer board shall be <br />labied "EXPOSURE 1", "EXTERIOR", or "HUD -APPROVED". (VIAQ, S. 401.1) <br />❑ 7 Insulation baffles shall be placed in attics/ceilings to maintain at least I" ventilation space and extend at <br />least 6" vertically above batts or 12" vertically above loosefill insulation (S. 502.1.4.5). <br />❑ QGlazing efficiency required under the selected option shall be (S. 502A.5, 602.7.2, Table 6-2): 0s U.70 (Option 1) (�s U.65 (Options 11, IV) �s U.75 (Option III) <br />s U.60 (Option V) 0s U.50 (Option VI) s U.45 (Option Vii) <br />Symbols used: = equals > greater than <less than <br />a greater than or equal s rasa than orequal <br />UPDATED SEPTEMBER 1991 <br />Page 2 of 6 <br />