Laserfiche WebLink
INP <br />f CTION REPORT <br />Address <br />:'t <br />I Contractor <br />Owner <br />Date <br />❑ APPROVAL ❑ PARTIAL APPROVAL <br />,... . <br />❑ VIOLATION &CORRECTION REQUESTED <br />0 Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />O Was not able to perform inspection. <br />ACALL 259-8810 FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />d,5�S Q <br />lnspectoraff& <br />Date <br />TYPE OF INSPECTION REQUESTED <br />❑ Temp. Elect. <br />❑ Footing <br />0 Framing <br />❑ <br />picas Piing <br />Drywall, Nailing <br />U Consu Cation <br />0 Foundation <br />❑ Shear Nailing <br />❑ Groundwork <br />❑ Ductwork <br />-0 Grid <br />❑ Struc4 Slab <br />❑ Wood Stove <br />ough-in <br />❑ Final <br />❑ Masonry <br />0 Serwce <br />❑ Insulation <br />❑ Other <br />❑ BLDG: Pmt. No. <br />r 1ECH: Pmt. No. <br />j e.,9 j K <br />❑ ELEC: Pmt. No. _ <br />0 PLBG: Pmt. No. <br />