Laserfiche WebLink
COMPLIANCE � � � � " • � � ` ` t <br /> • RE�UIRED � <br /> INsaecnoN �MPORTANT: �Q�LQI place checks In the tNo Ieft columns. <br /> � APPROVED� <br /> � � ��P� ,t �p ; - � <br /> O � �Exposed foam insulatlon shall comply as follows (S.502.1.4.7): <br /> ❑ Prctected with metal or plastic ilashing, or other suitable material that extends below grade. <br /> ❑ Insulation is approved tor sub-grade, exterior use and properly installed. <br /> p p �AlHlow between fresh air ports and the whole-house fan ensured by undercut doors/grills(VIAQ,S.302.6.4) <br /> 0 O �Loosetlll Insulation OK it (S.502.1.4.5): <br /> p maxinum ceiling slope not>3 in 12 <br /> �z 30"of clear distance irom top oi bottom chord to underside of roof sheathing at the rooi ridge. <br /> p O �6 mil biack polyethylene ground cover, shall be lapped 12" at joints and extend to foundation wall <br /> p O a Clearances shall meet listed minimums behveen insulation and (S.502.1.4.3): <br /> C�.chimney ❑Non-IC rated recessed lights: l/2"to combustables, 3"to insulation. <br /> p p � ttic hatch shall be insulated to required ceiling R-value and is weathersiripped (S.502.1.4.4) <br /> p p Attic access shall have wood dam or equivalent to retain loose fill insulation in atlic(S. 502.1.4.4) <br /> p p 9 All exterior doors (except 20 minute doors) shall be weatherstripped (S.502.4.3). <br /> O O o Service hot&cold water plping in unconditioned spaces shall be insulated to R-3(S.503.11) <br /> O O � Servfce reclrculation hot water piping in unconditioned spaces shall be insuiated to Table 5-12 levels. <br /> p ❑ I Q2 Heat pump thermostat shall have progamable r,apability(S.503.8.3.5) <br /> p O I(�2]Thermostat provided(or each HVAC system with range of 55-75' F.(heating) (S.503.8.1.1). <br /> 0 0 �Readily accessible,automattc or Manual means provided to restrict or shut-off Heating input to each <br /> zone or iioor during periods not requiring heat (S. 503.8.3.1). <br /> 'O O s ontrols for backup heat prohibft similtaneous operation of the primary system (S. 503.2.2(3)). <br /> p p e echanical ventilation system shall have proper timers, andlor switches(VIAQ, S.302.3). <br /> O L7 � echanical ventilation ducts shall have R-4 insulation in�mcondi�ioned spaces (VIAQ,S.302.5) <br /> O O 8 echanical ventllation supply ducts in conditioned spaces shall have R-4 insulation (VIAQ,302.5) <br /> O O g uppiy ducts shall have volume dampers, or the equivalent,to balance system(S. 503.6). <br /> O p �uppty and return air ducts shall have sealed duct joints in unconditioned spaces (S. 503.102). <br /> p p � VAC plenums, supply,and return air ducts shall have H-8 (nsulation (Table 5-11,All options) <br /> p p 2 Iectric water heater(s) shall have (S.504.2.1,504.3,504.4) : <br /> ❑separate power shut-of( ❑ 1987 NAECA Lable on tank <br /> ❑ noncompressible R10 pad (unheated spaces only) o Temperature setting s 120 F. <br /> O O �howers and lavatorles shall IimR flow to s 3.0 gatlons/minute (S.504.8.1). <br /> p p �Swimming pools(S.504.5) shall have: <br /> ❑readily accessible ONIOFF switch (pump, heater) ❑Pool cover ❑Piping insulated to S.503.11 <br /> O I� �AII fireplaces (VIAQ,S.402.3) shall have: <br /> �6 square inch combustion air supplyduct w/accessible damper directiy connected to the fire box <br /> �Tight titting glass or metal doors. �.Tight tiriing flue damper <br /> p ❑ s Soiid fuel burning appliance(s) (VIAQ, S.402.2) shall have: <br /> ❑Tight titting glass or metal doors <br /> o0utside combustion air source directly connected to the fire box <br /> o Exception: Non-direct, 4" diameter, dampered, combustion air source:allowed only tor(1) new stove <br /> installations in existing homes where obstructionsprecludes direct combustion air, or(2) Ceniral <br /> heating sysiems located in unheated spaces. <br /> O O � Three month, etched track radon monitor, printed instructions, and intormation sheets shall be supplied <br /> to the single tamily dwelling or tirst tloor units oi muiti-family dweltings by the general contractor(VIAQ,S. <br /> 502.2.1), <br /> WSEC Final phase requirements: <br /> Inspected by: Date <br /> Page 6 of 6 <br />