Laserfiche WebLink
. � PUBLIC WORKS PERMIT COMMENIS <br /> 4. Connect side sewer per City Standard#601. <br /> \_5� Connect side sewer per City Standard#'s 601, 602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> � Connect rooftop downspouts to the drainage system provided for this lot. <br /> 8. Ruoftop runo(f must be discharged to a roof downspout infiltratirn system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25' long. See attachment for <br /> more details. <br /> i —� <br /> � The contractor must meet wilh the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning the project. <br /> C0� I�stall erosion control measures as delermined by the Public Works inspector, such as silt (ence, straw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for small parcels <br /> �121 Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> � ! <br /> ( 13.� All excavated material from foundalion, sidewalk and driveways shall be hauied to an approved, <br /> �� permitted site. No wasting of material is ailowed on this building lot. <br /> C14.� No dirt, mud, rocks or debris to be tracked onto roadway. <br /> ` <br /> (15. ' No building materials to be stacked on sidewalks and sidewalks to be kept ciean and open for <br /> pedestrian travel. <br /> 16. Adjust water meter box 1"above sidewaik grade. <br /> C17. ; Remove and replace curb, gutter and sidewaik as per City oF Everett Standard Plan #'s 305A& 306 on <br /> _ lhis proposal's frontage as directed by lhe Public Works Inspector (i.e. all unused driveways and any <br /> broken or damaged area must be reptaced). <br /> 18. Install a Type I concrele driveway per Ciry of Everett St2ndard#307. <br />.� <br /> 19. Pave driveway irom the front property line out to the street paving. <br /> 20. Contact the Waler Districl for connecting provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#402 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, fhen <br /> gravity Flow across the public right-of-way. <br /> 23. A sprinkler system is required for this building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> POR PUBLIC WORKS INSPECTION, CALL RANDY AT 425-339-7d03/CLIFF AT 4::5-339-7404 <br /> FC;Ccm�n^nis <br /> zf� <br />