Laserfiche WebLink
PUBLIC WORKS DEPARIMENT f� " � � U U � �� <br /> UTILITIES DIVISION <br /> 3200 CEDAR STREEf Ma'r 2g �ggy <br /> EVEREIT, WpSHINGTON <br /> ..........................................__,_„ <br /> CITY OF EVERETI' Z <br /> COST ESTIMATE SHEET P��t'ic Works Dept, o <br /> -� <br /> .. <br /> c� <br /> m <br /> Requested by Kirk Erooks �� <br /> _Date of Request 5-13-85 „ „ <br /> Address Engineering Phone � T <br /> .. � <br /> �n x <br /> m <br /> Installation Location 5011 seahu�st m o <br /> c� <br /> Installation type/descrip[ion/sizei'etc. 6" water feed o a <br /> m <br /> -� z <br /> x -� <br /> m <br /> o z <br /> c <br /> a -i <br /> rx <br /> .. �. <br /> -�1 � <br /> � <br /> � <br /> Total Estimated Cost Sees.00 � � <br /> . . = m <br /> This estimate reflects the Utilities Division having to Saw cut. . ... . . . . . m N <br /> provide labor, equipment and materials to complete the above Shoring. . . . ... ... ., x <br /> mentioned installa[ion including, but not limited to, the Excavation. . .. . .. ., x � � <br /> items identified to the right, Any labor and/or equipment Backfill. . . . . . ... . . m `� <br /> provided by the contractor to facilitate the work by the City Compaction. . ... . . . . -_+� <br /> water department will be reflected in a refund to the person Temporary Pa[ch.. . . m <br /> making the deposit. ,_ A <br /> Permanent Patch. . . ._ ,� <br /> x <br /> Furnish double check valve assembly 9 <br /> z <br /> for [emporary water supply,, , , , , x = <br /> Final hook-up after puri[y ;,, <br /> and pressure testing. . ._ Z <br /> (Whenever the es[imated cost is not sufficient [o cover [he [otal expense for labor, o <br /> .�. <br /> material, equipment ren[al and administrative costs, the deficit shall be charged to [he "' <br /> property for whi.ch such installation was made and the owner thereof, and provided <br /> further, that any ex�:ess payment shall be returned to the person applying for [he <br /> installation.) <br /> Itemized Cost Estimate: <br /> .- <br /> Labor & Overhead S59o�00 � , , , � ,�, ,:�� <br /> 259=8821 <br /> Material 250.0o Estimate Prepared By Phone N <br /> Equipment Rental 96_00 �on taahl <br /> Surface Restoration cc: Larry Callahan <br /> TOTAL ESTIMATE Sefl6,00 <br /> _ Don Weitkamp <br /> Larry Crawford <br /> Bob Chervenell <br /> Bud Krom <br />