My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6409 ELLIOTT WAY 2016-01-01 MF Import
>
Address Records
>
ELLIOTT WAY
>
6409
>
6409 ELLIOTT WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 6:40:17 AM
Creation date
2/12/2017 6:40:10 AM
Metadata
Fields
Template:
Address Document
Street Name
ELLIOTT WAY
Street Number
6409
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( ! <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per Cily Standard #601. <br /> 5. Connect side sewer per City Standard #'s G01, G02, 604. <br /> 6. Connecl all rooftop d�wnspouts to the side sewer. <br /> � Connect rooftop downspouts to the drainage system provided for this iot. <br /> 8. Rooftop runoff must be discharged to a roof downspout infiltralion system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25' long. See attachmenl for <br /> more details. <br /> �� The contractor must meet wilh the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning the projecl. <br /> 10. Install erosion control measures as delermined by the Public Works inspector, such as silt fence, slrav+ <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion controi measures per City of Everelt Standards for small parcels <br /> � <br /> 12. Remove erosion conlrol measures upon completion of the pmject prior to final approval of the permit. <br /> _ , ------ -- -- - - -------- <br /> 13. All excavaled material from foundation, sidewalk and driveways shall be hauled lo an approved, <br /> permitted site. No wasling of material is allowed on this building lot. <br /> 14� No dirt, mud, rocks or debris lo be tracked onto roadway. <br /> 15. No building materials to be stacked on sidewalks and sidewalks to be kepl clean and open tor <br /> pedesUian Uavel. <br /> 1G. Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace � urb, guller and sidewalk as per City of Everett Standard Plan #'s 305A& 306 on <br /> lhis proposal's frontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damac�ed area must be replaced). <br /> 18. Instail a Type I concrete driveway per City of Everett Standard #3U7. <br /> 19. Pave driveway from the front property line out lo the slreet paving. <br /> 20. Contact the Waler District for connecting provisions for this building's waler and <br /> sewer services. <br /> 21. A calch basin as per Ciry Slandard Plan 11402 with a c�as trap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump syslem is to be installed, the pressure line must discharge inlo a private manhole, then <br /> graviry tlow across lhe pubiic right-of-way. <br /> 23. A sprinkler system is required for this building in compliance with the requiremenls of NFDA Standards <br /> 13D. <br /> PlSCom:n^nts ��� <br />
The URL can be used to link to this page
Your browser does not support the video tag.