Laserfiche WebLink
' CLOSED CM WORR ORDERS REPORT <br /> Total Utilit}' Maintenance Management System <br /> 09/03/1997 Page 1 <br /> Date Range : 12/03/1900 - OS/20/1997 <br /> C� �4ork Order Range : 1001091070001 - UT0021-35- Pattern :7101196751165 <br /> Item Range :<Blank> - WVL3694L05 Pattern : * <br /> Proqram ALL Function ALL Activity ALL <br /> CM WORK ORDER ID: 7101196751165 Title: REPAIR 6519 ELLIOT WAY <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS0685T030 -- WATER SERVICE <br /> Location ID: -' <br /> Program 710 Function 119 Activity 675 <br /> Date Completed: 07/25/1997 <br /> Overall Craft: <br /> Zssued: 07/25/1997 Issued by: WMW Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planned Hrs Ac�cual Hrs Cost <br /> ----- ------ ------------------ <br /> ------------ ----------- ---------- --- <br /> UL CSG CF+VANAH, SHANE G. 0 . 00 2 . 00 26.96 <br /> WST TDE1 THOMPSON, DWAYNE E. 0. 00 2 . 00 38. 30 <br /> SUP1 WLK WARNER, LAR$Y K. 0. 00 1. 50 34 .28 <br /> SUP1 WMW WARD, MICHAEL W. 0.00 2 . 00 _____�k5_12 <br /> Total Labor Cost: 144 . 66 <br /> Materials: <br /> ID Description Uate # Used Cost <br /> ----------------- -------- -------- -- <br /> ADAP34000347 ADAPTER 3/4" CST X INSTA-TITE@ 07/25/1997 1 7 .93 <br /> ADAP34000547 ADAPTER 3/4" MIP Y ZNSTA-TITE@ 07/25/1997 2 16. 76 <br /> ADAP34000647 ADAPTER 3/4" FIP X INSTA-TITE@ 07/25/1997 1 7 . 65 <br /> BOX000065547 BOX METER CONC W/STEEL LZD 07/25/1997 1 49.92 <br /> COUP34004347 COUPLING 3/4" MIP X COP ELL @ 07/25/1997 1 � • 81 <br /> COUP36143547 COUPLING 1" CTN X 3/4�' MIP @ 07/25/1997 1 4 .82 <br /> ELL034104247 ELL 3/4" 90 DEG STREET BRASS � 07/25/1997 2 3 . 02 <br /> PIPE34060647 PIPE 3/4" POLY I. P.S. 07/25/1997 3 0. 63 <br /> SETT34146547 SETTER COP 5/S" X 3/4" (H9") 07/25/1997 1 41. 10 <br /> Total Material Cost: 135 64 <br /> Vehicles: <br /> I� Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V2048 89 GMC S15 2 . 00 10. 20 <br /> V2062 90 NISSAN PU 1. 50 7 .95 <br /> V2119 91 CHEV 5 YD 2 . 00 21. 60 . <br /> V:146 87 CHEV 1 TON W/AYD. UNIT 2 . 00 9 . 60 <br /> Total Vehicle Cost: 49 . 35 <br />