My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6605 ELLIOTT WAY 2016-01-01 MF Import
>
Address Records
>
ELLIOTT WAY
>
6605
>
6605 ELLIOTT WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 6:53:38 AM
Creation date
2/12/2017 6:53:31 AM
Metadata
Fields
Template:
Address Document
Street Name
ELLIOTT WAY
Street Number
6605
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ( <br /> - � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> 5. Connect side sewer per City Standard#'s 601, 602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> 7. Connect roofb�p downspouts to the drainage system provided for this lot. <br /> ( 8.) Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br /> `� Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25' long. See attachment for <br /> more details. <br /> � The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning the project. Call Rand Allen at 425-339-7403 //Call Cliff Lindman at 425-339-7404. <br /> 10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion control measures per Ciry of EvP�ett Standards for small parcels <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> 13. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> permitted site. No wasting of material is allowed on this building lot. <br /> 14. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 15. No buitding materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and <br /> open for pedestrian travel. <br /> 16. Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A 8 306 on <br /> this proposal's frontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damagecJ area must be replaced). <br /> 16. Instail a Type I concrete driveway per City of Everett Standard#307. <br /> 19. Pave driveway from the front property line out to the street paving. <br /> 20. Pave to existing pavirn� in alley. <br /> 21. Contact the Water District for con�ecting provisions for this building's water and <br /> sewer services. <br /> 22. A catch basin as per City Standard Plan dt402 with a gas trap per Standard Plan#410 is required for the <br /> parki�g area. <br /> 23. IF a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br /> gravity Flow across the public right-of-way. <br /> 24. A sprinkler system is required for this building in compliance with the requirements of NFPA Standards <br /> 13D. <br /> � .� <br /> PWCanmen <br /> fs I Revised 618111 ��' <br />
The URL can be used to link to this page
Your browser does not support the video tag.