Laserfiche WebLink
( ( <br /> Ltr. L. Vrieling <br /> July 17, 2007 <br /> Page 2 <br /> 4. Specify posdfooting conncction and post/beam connection. <br /> 5. The engineering �alls out a Simpson STHD8RJ wliich is for use with a rim joist, the <br /> garage does not have a rim joist. Please correct. <br /> 6. Provide lettcr from engineer verifying that he lias reviewed the plans for compliance <br /> with the cngineering. <br /> Please pre,are a response letter showing where each item in this correction letter is addressed <br /> on the plan set. <br /> Upon resaUmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufGcient detail and contain sufficient infomiation to ensure <br /> that Qre proposed structure will bc constructed in compliance with all adopted codes. <br /> Sincercly, . <br /> C_ .,c�j�'.uL--� <br /> Jeff Heil �an <br /> Devclopment Technician <br /> � ' <br /> �n�:uuri.�c�nfsranir.u.nur+mmosw�a i i i;�.i.iorr wnr� <br />