My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4913 ELM ST 2016-01-01 MF Import
>
Address Records
>
ELM ST
>
4913
>
4913 ELM ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 7:26:20 AM
Creation date
2/12/2017 7:26:11 AM
Metadata
Fields
Template:
Address Document
Street Name
ELM ST
Street Number
4913
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewcr per City Standard#601. <br /> 5. Connect side sewer per City Standard #'s 601, 602, 604. <br /> G. Connecl all rooflop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 8. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25' long. See altachment for <br /> more details. <br /> / 9. ) The contractor must meet with fhe Public Works Inspector to discuss potential drainage routing prior to <br /> �� beginning the project. <br /> 10. Instalt erosion control measures as�ietermined by the Pubiic Works inspeclor, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> 13. All excavated material from(oundation, sidewalk and driveways shall be hauled to an approved, <br /> permitled site. No wasting of material is allowed on �his building lot. <br /> 14. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 15. No building materials to be stacked on sidewalks and sidewalks to be kept ciean and open for <br /> pedeslrian lravel. <br /> 16. Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, c�utter and sidewalk as per Ciry of Everett Standard Plan#'s 305A& 306 on <br /> this proposal's frontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per Cily of Everett Slandard#307. <br /> 19. Pave driveway from the front property line out to lhe street paving. <br /> 20. Cont;3ct the Water District for connecting provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per City Slandard Plan#402 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole,then <br /> gravitp(low across the public ric�ht-of-way. <br /> 23. A sprinkler system is required for this building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> PWCemmeNs <br />
The URL can be used to link to this page
Your browser does not support the video tag.