Laserfiche WebLink
, TO BE COMPLETED BY APPLICANT EVALUATION FOR <br /> AGENCY USE ONLY <br /> C. Is the site part of a migration route? If so, explain. <br /> N/A <br /> d. Proposed measures to preserve or enhance wildlife, if any: <br /> N/A• <br /> 6. Energy and Natural Resources <br /> a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet <br /> the completed project's energy needs? Describe whether it will be used for heating, manu- <br /> facturing, etc. <br /> No increase in usage <br /> b. Would your project affect the potential use of solar energy by adjacent properties? If so, <br /> generally describe. <br /> N/A <br /> c. What kinds of energy conservation features are included in the plans of this proposal? <br /> List other proposed measures to reduce or control energy impacts, if any: <br /> N/A • <br /> 7. Environmental Health <br /> • <br /> a. Are there any environmental health hazards, including exposure to toxic chemicals, risk <br /> of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? <br /> If so, describe. <br /> No <br /> • <br /> I) Describe special emergency services that might be required. <br /> N/A <br /> • <br /> 2) Proposed measures to reduce or control environmental health hazards, if any: <br /> N/A <br /> b. Noise <br /> 1) What types of noise exist in the area which may affect your project (for example: <br /> traffic, equipment, operation, other)? <br /> N/A <br /> 2) What types and levels of noise would be created by or associated with the project on a <br /> short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi- <br /> • cate what hours noise would come from the site. <br /> Traffic noise , 7- 9 AM, 11 :15-11 :45 AM, 4-6 PM <br /> Monday through Friday <br /> 6. <br />