Laserfiche WebLink
TO BE COMPLETED BY APPLICANT EVALUATION FOR <br /> AGENCY USE ONLY <br /> g. Proposed measures to reduce or control transportation impacts, if any: <br /> • Staggered drop off and pickup times <br /> • <br /> 15. Public Services <br /> a. Would the project result in an increased need for public services (for example: fire pro- <br /> tection, police protection, health care, schools, other)? If so, generally describe. <br /> No • <br /> • <br /> b. Proposed measures to reduce or control direct impacts on public services, if any. <br /> N/A <br /> 16. Utilities <br /> a. Ci tiliti I available at the site:GOOMPnatural gas, ateD eft <br /> '�( lephone, anitary sewer septic system, other. <br /> b. Describe the utilities that are proposed for the.project, the utility providing the service, <br /> and the general construction activities on the site or in the immediate vicinity which might <br /> be needed. <br /> No change from existing usage <br /> C. SIGNATURE 11111 <br /> The above answers are true and complete to the best of my knowledge. I understand that <br /> • <br /> the lead agency is relying on them to make its decision. <br /> Signature: <br /> Date Submitted: <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • to <br />