Laserfiche WebLink
� � � <br /> Ad�1re»�,r�itr fD: <br /> 1994�!�TSEC.Residenti�a}:.ClieekTisf pa�e � <br /> INSULATIOIV PHASE „ <br /> Com liance Re uired J <br /> Ins etlion A roved � <br /> � Q 16. Exterior slab on grade insulation, Shall be R-1 U lPrescripnve OpNuns) GR <br /> O O R" '-- fur calculatrd upeun�. <br /> � � 17. Exterior below grade wall insulauon shall l�e R-lU lPre_cripdve Opti�msl OR <br /> � � jt" � fnr calculated uptiunn. <br /> � � 18. Exterior slab or wall insuiation shall Lie apprc+ved fnr belnw-�rade use. I I <br /> Q � 19. Walls,includinG rim joists,�hall be in_ulated wid�uut compres_iim accordinG h>>elected � <br /> Pre�cri nve O Hnn i+r calculari�m_ a� R- • <br /> Q � 20. Interior below grade walls�hall Ue insulated withnut a+m re:siun h� R- �• � '� <br /> 0 0 21. Skylight walls shall be insulated withnut cumpressinn tn the wall R-value. <br /> Q Q ?:. Vaulted ceilings shall be imulated withuut a�m res�iun a� R- " • I <br /> 0 � Zi• Vapor retarden :hall be in_talled ti��va:d the warn ourtace as repre:r.nted Uelnw (il)2.1.6): <br /> �rlec[�me��pciim fur Flin�r�, �val1=,and appn�priate ceilinGo: 1 <br /> Flaors O Plv�wu,d �v/esteriur�lue O P�,ly l>_� ;�till � 8acked batt= ; <br /> Walls O I'uly piastic(h_4 Mit) � Face-etapled,backed batts 0 Li�w-perm paint ; <br /> Ceilings O Nut required where vennlatiun space averages >_12" aU��ve insulatiun. x <br /> � Face-sta led backed batri � ['�dv lastic(>_� M�11 O Luw- ecm aint r <br /> � � 24• Heating system efficiency and sizing requirementR:hall be met a�repre=ented bel��w (5.503): I i <br /> � � 25• [-Ieat pump efficiency,as listed in the ARI directory,nhall be met as Eolle�ws � <br /> � <br /> O Split�vstem.air s�+urce heac pump: HSPF>_fi.8, COf?3.11 � <br /> O SinGle pack.iGe,air snurce heap pump: HSPF>_fi.6,COP ?�.�1 � <br /> � Water�i�urce heit pump:COP>_3.8. <br /> O Gruund s�wrce heat um : CO(' _?.0 <br /> � Q 26. Central combustion heating sysrem AFIIE nenG,as liated in the GA,�IA Directe�ry, shall be: <br /> O >_.i8 (�1ed. Pre_criprive Opriun�&Ch;jp � Calculatinn) O >_.��(HiGh Efficienc�'Optii�i;;1 I <br /> O >_.7�(Lnw Efficiencv O tinns) � Other (u er�vstem� .�nalvsi�Qualificatian) I , <br /> � � 27• Nan-central combustion heating sysrems shall hTve intermittent iGnirinn. <br /> 0 � 29. Maximum heating system output(150`,'.•�rt desiGn he�f luadl i5 KW ��r BTIi/hr. <br /> Q � Z9• High efficiency forced-air furn�ce (<_SF,111111 BT1J/�ir iwtput) may exceed the DesiGn Heat Luad <br /> (DHU. GAMA li=ted �.FIJE is >_i� — 1 per each 5(lUl� BTli/hr uutput that it esceeds the DHL. <br /> HeatinG oystem requirements will lm mec with the tullnwin�;sy=_tem (SS�13.�•1•1): <br /> �Eg �todel# <br /> �lax,uutput KW ur BTU/��r. <br /> Te e HSPF mul/or COP <br /> � <br /> WSt"C Gisidntimr ('huse Rrq�iir�an�nts: <br /> Insoected bv Date• <br /> ? <br /> � <br /> � <br /> � <br /> i <br /> i <br /> � <br /> I <br />