1 <br /> February 27, 2009 <br /> Sultan Crossing <br /> L&A Job No. 9AOOR <br /> Page 4 <br /> After the steel pipe pile is driven to refusal, the steel pipc pilcs should bc bolted onto the concretc <br /> piers with dowel bazs epoxy-grouted in holes drilled into the concrete piles, as shown on Plate l. <br /> Also to be installed aze a pair of helical anchors installed on the sidcs of each concrete piers to be <br /> strcngthened. A steel channel is then set on top of the stecl pipe piles and bolted onto the <br /> concrete piers. The helical anchors are then stressed as much as possible with a pipe ��Tench, <br /> then locked off against the steel channel. The pair of helical anchors of each concrete pier should <br /> be stresscd simultuneous to maintain balancc of the channcl against the concrete pier. <br /> Aftcr the above work is completed. The excavated pits should bc backfilled wilh cican onsite <br /> granular soils. Thc soils should be placed in lil�s no more than 10 inches thick. With each lift to <br /> bc compacted to a non-yielding statc with n vibratory compactor. <br /> CLOSURE <br /> We are pleascd to bc of service to you on this project. Please feel frec to call us if you have any <br /> queslions regarding this report or need furthcr consultation. <br /> ��5'. <br /> r. �Tl t r.F Yours very truly. <br /> �.ti��pFw�sfU�c��J�, LIU & ASSOCIATLS, 1NC. <br /> c rJ � � <br /> y �`r d'_1 y' /� <br /> 2 `��]'�Zo �, �`� <br /> �._�. <br /> ; zrsrs:� J. S. (Ju ian) Liu, Ph.D., P.G. <br /> ��,���t��� �' Consulting Geotechnical Gngineer <br /> �ONAL�`� <br /> ;��F�n[s 71i�i1 p� � <br /> Onc platc attached <br /> LIU & ASSOCIATES, INC. <br /> � �:/ <br />