Laserfiche WebLink
( ( <br /> � <br /> March 26,sooQ ' <br /> Mi,dV�Mendich ' <br /> p�3 <br /> We recommend t d�ese oiAe Piles be desi�ed for a worldng capadty of 4.0]dPs,end <br /> t iey c drlven to nto e aue�vance�waeti saus una�the site. <br /> Estimated depthe to refusal will ranBe from about 8 to i2 feet,dependin�on @►e dePth , <br /> of 911 mcountered at the fooung]ocadons. Refusal of the pipe pile is meas�ned by i lnch <br /> of peaetration per minute of conHnuous dzivin8 with a 90*Pnn�matic�amtner. <br /> Bearing waIl footing�on the west and south mdea oF the gara6e may be d�ed for an <br /> allowable eoil v ue of i000 psf to account for vatlable aoils unda'the carport a�• We <br /> ' • recommand that theee oo be Snspected along with the pipe pile in�llatlon to <br /> � • vertfy that We�ecommended load bearin8 caPadties have beea achleved. All footing.+ <br /> � ' shottld be rdnforad. � - <br /> � . �ummarx <br /> We recnm mend that we be retained to re��e�w tboee portioaB of the plans and <br /> speeiflrallons to detercnine that lhey are c�aiatent with the recommendadone of thia <br /> report, Coqstruction monitoring and conaultarion eecvices ahould aleo be provided to <br /> verify that subetuiace conditions are similar to thoae reported on the borin8�ai►d test plt <br /> logs. Should conditlons be revealed during oom.struction that differ from the anttcLpated <br /> subeurface proflle,we wlll evaluate those rnnditione and provide atte:native <br /> recoxnmendatlons where aPPT�P�te. • <br /> The.conclusions and recommendaUana preeented in thls repo�t are baeed on our <br /> intapretadon and evaluation of soil conditiona ons�u,and the aBewnPKon that <br /> euffident obeecvadon and testing wtIl be p�ded during approp�te phseea of the <br /> tvnrk. <br /> CJur flndings and recommzndadons of this ceport wen prepared In accordancx with <br /> generally accepted prindples of geotechnical engineering ae precdced in the Puget <br /> Sound area at the time this repoit waa euhmitted.TMWe�makewish t diac�uae thlt iepoct <br /> or lmplied. P'lease call me if you have any ques 3� <br /> in greater detail. <br /> ePectfuIlY� •� ° 'p r0 <br /> ` �E � � <br /> M.Prlde, .E. <br /> Principal Geotechnical F�giueer ,s <br /> � '6n', �,. <br /> uta�. l'd'/ j�uu+uux,� �a00'd� <br /> n► <br /> rmp: Mendkh8�aett .�.-�-^_� . <br /> IJ30)Hd�et Mel Deln NS ICkMlyd.µ'A 9�W�-1601 3/.3 <br /> Pfiooe:N3l1 I14�9'/O Fu:N�SIl14S�72 ( <br />