My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1625 ENGLAND AVE 2016-01-01 MF Import
>
Address Records
>
ENGLAND AVE
>
1625
>
1625 ENGLAND AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 8:32:09 AM
Creation date
2/12/2017 8:31:47 AM
Metadata
Fields
Template:
Address Document
Street Name
ENGLAND AVE
Street Number
1625
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br /> � Connect side sewer per City Standard#601. <br /> 5. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> � Connect rooftop downspo�ts to the drainage system provided for this lot. <br /> 8. Rooftop runoff must be discharge�to a roof downspout infiltration system per City of Eve�att Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25' long. See attachment for <br /> more delails. <br /> � The contractor must meet with Ihe Public Works Inspecfor to discuss potential drainage routing prior to <br /> beginning the project. <br /> 10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, siraw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for small parcels <br /> 12. Remove erosion conlrol measures upon complelion of the project prior lo final approval of the permit. <br /> �13.� All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> ' perniitted site. No wasting nf malerial is allowt: on this building lot. <br /> �4.� No dirt, mud, rocks or debris to be tracked onto roadway. <br /> �5�) No building materials lo be stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedestrian travel. <br /> �6. Adjust water meter 4ox 1"above sidewalk orade. <br /> 17. � Remove and replace curb, gutter and sidewalk as per Ci.ry of Everett Standard Plan #'s 305A& 306 on <br /> this proposal's irontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damac�ed area must be replaced). <br /> 18. Install a Type I concrete driveway per City oi Everelt Standard#307. <br /> 19. Pave driveway from Ihe front property line out lo the street pavinc�. <br /> �� <br /> 20. Contact the Water District(or connecting provisions for this building's waler and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#402 with a gas trap per Slandard Plan#410 is required for the <br /> paiking area. <br /> 22. If a sewer pump system is lo be installed, the pressurc iine must discharge into a private manhole, then <br /> gravity flow across the public right-of-way. <br /> 23. A sprinklcr system is required for this building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> FOR PUBLIC WORKS INSPECTION, Cf1LL RANDY AT 425-339-7403/CLIFF AT 425•339-7404 <br /> P14Ccn,ment5 �� <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.