Laserfiche WebLink
' i <br /> PUBLIC WUf�KS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> ';� � Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> � i`-9l.) Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> � Storm Manual 3-2.6.2. Width ��, Depth _, Length�: <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> �� 11 Instal' erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parceis <br /> � 13. Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> f-�' <br /> �) 14 All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Publir.Works Inspector(i.e. all unused <br /> driveways and any broken or damaged area must be replaced). ' <br /> 16. Install a Type I concrete driveway per Cily of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be instailed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> „--�21 J A'Sprirtkls�eyStem is re i d for this uilding cin o liance wit the req 'Cements of NFDA <br /> � Standards 13D. � <br /> � <br /> ( <br /> P <br /> PIVComment5 <br />