Laserfiche WebLink
// A <br /> ■ l / <br /> . 1 � <br /> PUBLIC WORKS PERMIT COMMENTS . <br /> q. Contact the Public Works Inspector(call )to d s�uss the project prior to beginning work. <br /> 4. Connect side sewer per City Stan�ard#601. <br /> 5. Connect side sewer per City Standard#'s 601, 602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> � Connect rooftop downspouts to the drainage system provid2d for this lot. <br /> g. Rooftop runoff must be discharged to a roof downspout infiltration system per City oi Everett <br /> Storm Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2' deep and 25' iong. See <br /> attachment for more details. <br /> g. The contractor must meet with the Public Works Inspector to discuss potential drainage routing <br /> prior to beginning the project. <br /> 10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, <br /> straw bales, swales, or erosion blankets. <br /> ��..j Inslall erosion control measures per City of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> � 13. . All excavaled material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> �-�� permitted site. No wasting of material is allowed on this building lot. <br /> 14. ,� No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 15. No buitding materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clea� <br /> and open for pedestrian travel. <br /> 16. Adjust water meter box 1" above sidewalk grade. <br /> �7. Remove and repiace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A& <br /> 306 on this proposal's irontage as directed by the Public Works Inspector(i.e. ali unused <br /> driveways and any broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per City ot Everett Standard#307. <br /> Gj 9. J Pave driveway from the front property line out to the street paving. <br /> (� C/r✓ri<G �- 3i-�o <br /> 20. Contact the r1�i.�ci�lL' �Naler District�for connecting provisions for this building's water <br /> and sewer services. �� <br /> 21. A catch basin as per Cily Standard Plan#402 with a gas trap per Standard Plan#410 is required <br /> for the parking area. <br /> 22. If a sewer pump system is to be insta!led, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> , <br /> � —_ <br />