Laserfiche WebLink
� <br /> January 15, 1980 <br /> Snohomish County P.U.D. c [:eryraen <br /> AT'fN: Mr. R. S. Billings CITY OF <br /> P. O. Box 1107 everett <br /> Everett, WA 98206 <br /> GTY HhLL� S!p•!l0! <br /> EVCRCiT. W�SNINGTON <br /> Subject: P.U.D. Permit #80-1 •�:�� <br /> W.O. 4f878 <br /> Dear Mr. Dillings: <br /> Your application for a permit to in ion of underground power system <br /> within the public right-of-way 2503 Euclid h s been approved on January <br /> 11, 1980 as per plan (1V.0. /�0 111). <br /> The subject permit approval is based on the agreemen t that all work will be <br /> carried out in accordance with the City of Everett standards and American <br /> Public Works Association specifications for trench excavation and bacl<filling <br /> ' " (Reference: Section 61, par. 3.05 and 3.06). All hard surface street crossings <br /> shall be by jacking, boring or other preapproved construction methods. <br /> It will be the obligation of the utility company to bear any costs that may <br /> be incurred in testing and confirming the requirements. <br /> The restoration of all landscaping and repairs will be comparable with its original <br /> condition and to the satisfaction of the City Engineer or his appointed representative. <br /> It will be your responsibility to contact th�: City Engineering Department <br /> (phone 259-8811) immediately prior to starting construction. <br /> Sincerely, <br /> HUGH WARRCN, P.E. <br /> Director o ubli� Y" ks <br /> �%����1 , <br /> ' L �c�c.---_. <br /> By: Jeff Kerwin <br /> Utility Inspector <br /> H\V:JK:jcl <br />