Laserfiche WebLink
� � � ,, <br /> ,, <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Pub�ic Works aoproved plan dated <br /> 5. Connect sidEi sewer per City Standard #601. <br /> 4 e Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all reoftop downspouts to the side sewer. <br /> 8. Connect rooftop d��wnspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Siorm Manual 3-2.62. Width_, Depth _, Length _. <br /> 10. A catch basin as per Ci[y Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the pa.rking area. <br /> 11. Remove and replace curb, gutter and sidewalk as per City of Everett 8tandard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Pubiic Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be repiaced). <br /> 12. Install a Type I concrete driveway per Ciry of Everett Standard #307. <br /> 13. Pave drivewa� from the '��'Cd�� <br /> / � line out to the street paving. <br /> 14. Contac' the Water District for connecting provisions fo;this building's <br /> water and sewer services. <br /> 15. If a se� r pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> �he contractor must meet with the Public Works inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 17. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> � 1�. All excavated material from foundation, sidewalk and drivaways shall be hauled to an <br /> approved, permitted site. No wasting of mate-ial is ullowed on thi3 building lot. <br /> 19. Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 20. Remo�:e erosion control measures upon completion ot the project prior to final approval of the <br /> permit. <br /> 21. Ins;all erosion control measures per City of Everett Standards for sm�ll parcals. <br /> � .��,sfaCL a. Silt ;��ce aLo�� �l,e �Qsf ,o�o�rfY <br /> Gine p� cify _S'f� hd4�� -�'`�oss+ � zos.B �� <br /> PWComments <br /> � ?"�o Gi.,/(/�'_(//y� �irr f'vr1�/LeL �0��1�0�� on EueCid U.�i«// neec� <br /> � � h'lOfi(.C�, �OI7�4C1 T/IL� r U�. �LI71fG� Q' �?'iiW4f�L•✓'.SL�I-v/L� L/^.'G <br /> �'ro••, �r• mc�/i�. �fo f/¢ B�..Lo��J <br /> - — -- -- _ _ � <br />