My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1918 EVERETT AVE 2016-01-01 MF Import
>
Address Records
>
EVERETT AVE
>
1918
>
1918 EVERETT AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2017 7:15:20 PM
Creation date
2/12/2017 7:14:13 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERETT AVE
Street Number
1918
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� The tollowing is a list ot the 1994 nonrosideMial complianee tortns tAeir use. • <br />! <br />� Envelope <br /> ENVSUM Envelope Summary- Use this fortn for all projects where envelope worlc Is to be dc+ne; there are sepa- <br /> rate versions for Climate 2one 7 and Zone 2. Show basic project infortnat'on, compliance options chosen. summary <br /> list o(required insulation levels and U-factors. Back side has Decision Flawchart for Prescriptive Option <br /> ENV-CHK Building Pamtit Plans Cheeklist -Comprehenslve iist of all iniortnatinn required on plans tor all op- <br /> j tions, including the Component Pertortnance and Syslems Analysis Oplions. Also includes space for buiiding de- <br /> partment notes. <br /> i ENV-UA Envelope UA Calculations- Use this fortn il using the Component Pertormance Option; <br /> I Summary calculations of Target UA and Proposed UA. Back side has <br /> calculation of Tarpet and Proposed SHGC, and calculation of glazing and opaque tart�et area adjustments, if needed. <br /> j Mechanical <br />� MECHSUM MechaMcal Summary- Use this fortn(or all projects where mechanical work is to be done. Show ba- <br />' sic project in(ormation, compliance approach chosen, lisl of basic equipment 3 eHiciencies (else this infortnation <br /> goes on equipment schedules on the plans). Back side has Decision FlowchaA for Simple System option. <br /> j MECH-CHK Mechanical Pertnit Plans Checklist-Comprehensive list of ail iniormation required on plans for all <br /> uptions, including the Component Periormance and Systems Analysis Optians. Also inGudes space lor building de- <br /> pariment notes. <br /> MECH-COMP Mechanical -Complex Systems- Use this fortn if using the Complex Systems Option. Complex <br /> Syslems Checklist has additional in(ormation required on ptans for this Option. Decision Ilowchart is provided for <br /> determining which Complex Systems requirements apply to the pr�ject. <br /> MECH-MOT Eleetric Motors Checklist for electric motors compliance and schedule of installed motors, both for <br /> i mechanical systems and other equipment. <br />� <br /> I <br /> Lighting <br /> i <br /> LTGSUMM Liyhting Summary- Use this tortn for all projects where lighting work is to be done. Basic projea in- <br />�i tormation. compliance approach chosen, alteration exceptions. Calculations of Allowed anQ Proposed Ughting <br />! Power for both Interior and Exlerior LigAting if using the Lighting Power Allowance Option. 8ack side has questions <br /> i to determine if project qualifies for the Prescnptive Option. Also has Lighting Power Allowance tablelfootnotes. <br /> LTG-CHK Lighting Pertnit Plans Checklist-Comprehensive list of all information required on plans for all o� <br /> tions. including Component Performance and Systems Analysis. Also inGudes space for building depaAment notes. <br /> i <br />� I <br /> I I <br /> j i <br />, <br />� <br /> PAGE TWO (2)�d <br />
The URL can be used to link to this page
Your browser does not support the video tag.