Laserfiche WebLink
PUBLIC WORKS PERMIT CC)MMENTS <br /> , <br /> 4. As per Publ'.c Works approved plan dated I� <br /> 5. Connect side sewer per City Standard #601. <br /> 6. lConnect side sewer per City Standard #'s 601, 602, 60d. <br /> . ^ <br /> 7. Connect all rooftop downspouts to ihe side sewer. <br /> 8 Connect rooftop downspouts to the drainage system provided for this lot. <br /> i <br /> 9. Rooftop runoff must be discharged to a roof downspout intiltration system per City of Everett <br /> Storm Manual 3-2.6.2. Width _, Depth _, Length_ <br /> 10. The contractor must meet with the Public Works Inspector t� discuss potential drainage <br /> routing prior to beginning the project. <br /> i t. Install erosion control measures as determined by the Public Works inspector, such as silt � <br /> � fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> 13.�emove erosion controi m�asures upon completien of the project prior to final approval of the <br /> permit. <br /> 1 s. qll excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> �approved, permitted site. No wasting of material is allowed on this building lot. <br /> t 5. Remove and replace curb, gutter and sidewalk as per City of Everett Stand,3rd Pian �'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard �307. <br /> 17. Pave drivew2y from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this buiiding's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan »402 with a gas trap per Standard Plan #�t10 is <br /> reauired for the parking area. <br /> 20. If a sewer pump system �s to be installed, the pressure line must discharge into a private <br /> manhole, then gravity tlow across the public right-of-v�ay. <br /> 2� . A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standares 13D. <br /> -„__ : ,5 �L <br />