My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2403 EVERETT AVE 2016-01-01 MF Import
>
Address Records
>
EVERETT AVE
>
2403
>
2403 EVERETT AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2017 6:35:41 AM
Creation date
2/13/2017 6:35:25 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERETT AVE
Street Number
2403
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> 5. Connecl side sewer per City Standard #'s 601, 602, 604. <br /> 6. Connect all rooftop downspuuts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 8. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25' long. See atlachment for <br /> more details. <br /> 9. The contractor must meet with the Public Werks Inspector to discuss potential drainage routing prior to <br /> beginning the project. <br /> 10. Install erosion control measures as determined by tlie Public Works inspector, such as sill fence, straw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for small parcels <br /> 12. Remove erosion conlrol measures upon completion of the project prior to final approval of the permit. <br /> 13. All excavated material irom foundation, sidewalk and driveways shall be hauled to an approved, <br /> permilted site. No wasling of material is allo�ved on lhis building lot. <br /> 14� No dirt, mud, rocks or debris lo be tracked onto roadway. <br /> 15. � No building malerials to be slacked on sidewalks and sidewalks lo be kept clean and open for <br /> pedestrian travel. <br /> 1 G. Adjust water meler box 1"above sidewalk grade. <br /> C17.% Remove 2nd replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A& 30G on <br /> "�\ lhis proposal's frontage as directed by the Public Works Inspeclor(i.e. aIl unused driveways and any <br /> broken or damac�ed area musl be replaced). <br /> 18. Install a Type I concrete driveway per City o(Everett Standard�t307. <br /> 19.� Pave driveway from the front property line out to the street paving. <br /> 20. Contact the Water District for connecting provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#402 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump syslem is to be installed, the pressure line must discharge into a private manhote, then <br /> gravity flow across Ihe public right-of-way. <br /> 23. A sprinklcr system is required for this building in complianc�with the requirements of NFDA Standards <br /> 13D. <br /> FiJCem:nenls .� <br /> � f <br />
The URL can be used to link to this page
Your browser does not support the video tag.