Laserfiche WebLink
. � � <br /> Respons� to Letter dated May 23'' and subsequeni pt�one conversation on 06/O5, for Everett Ave Plan <br /> Check NCW1204-0OS <br /> 1. See attached. <br /> 2. New stair calculations on drewings. <br /> 3. See attached schedule for connectors and locations. <br /> 4. See attached drawings for guard connections. <br /> 5. See attached drawings for X-bracing that will he added to all landing posts fo� resisting wind and <br /> seismic loads. <br /> 6. Per phone conversation all rear landing posts will 6e 6x6 pressure treated alleviating need for <br /> gravity load calculations. <br />