Laserfiche WebLink
TO POSTING �Z- Z� _s; 2 <br /> CIASED CM WORK ORDERS REPORT <br /> Total Utility Maintenance Management System <br /> 11/07/1994 Page 1 <br /> --- --- --- --- --- - -------- -- <br /> ------------------------------------- <br /> Date Range : 11/01/1991 - 11/04/1994 <br /> CM Work Order Range :<Slank> - 8405421080001 Pattern :7401196647788 <br /> Item Range :<Blank> - WW22020001 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> -------------------------------------------------------------------------------- <br /> -------------------------------------------------------------------------------- <br /> CM WORK ORDER ID: 7401196647788 Title: SO 3511 1/2 EVERETT AVE 3/4 INCH �ESID <br /> Item ID: -- <br /> Location ID: -- <br /> Program 740 Function 119 Activity 664 <br /> Date Completed: il/O1/1994 <br /> Overall Craft: <br /> Issued: 08/10/1993 Issued by: SKL Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0. 00 Ar. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------- ----------- ---------- ---------- <br /> WST MKC MOORE, KIM C. 0. 00 3.00 59. 19 <br /> UL SRJ STENSETH, ROBERT J. 0. 00 15.50 227.85 <br /> UL TDE1 THOMPSON, DWAYNE E. 0. 00 3.00 43.05 <br /> WST WDT WALDEN, DAROLD T. 0. 00 16. 00 311.04 <br /> Total Labor Cost: 641. 13 <br /> Materials: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> � ADAP34000447 ADAPTER 3/4" IPS IINION INSTA @ 11/O1/1994 1 8. 31 <br /> ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITE@ 11/O1%1994 1 7. 59 <br /> BOX000056247 BOX METEIt PLA 15" X 10" W/LID 11/O1/1994 1 12. 30 <br /> CORP34001847 CORP STOP 3/4" CCT X INSTA @ 11/O1/1994 1 15.83 <br /> PIPE34060647 PIPE 3%4° POLY I.P.S. 11/O1/1994 73 17. 52 <br /> SADD46018247 SERVICE SADDLE S" W/3/4" CCT 11/O1/1994 1 13 . 11 <br /> SETT34146547 SETTER COP 5/8" X 3/4" LGTH 9" 11/O1/1994 1 34.43 <br /> Total Material Cost: 109. 09 � <br /> Vehicles: <br /> ID Description Date Hours Cost <br /> ------------ ------------------------------ -------- ------ ---------- <br /> V2117 CHEV 1 TON '91 11/O1/1994 3. 00 17.40 <br /> V2119 CHEV 5 TON 91 11/O1/1994 3. 00 31.20 <br /> V2146 SVC TRUCK CHEV 87 10/31/1994 8 . 00 41. 60 <br /> V2146 SVC TRUCK CHEV 87 11/O1/1994 8. 00 41. 60 <br /> VH0003 94 CASE BACKHOE 10/31/1994 8. 00 0. 00 <br /> VH0003 94 CASE BACKHOE 11/O1/1994 8 . 00 0.00 <br /> Total Vehicle Cost: 131.80 <br />