Laserfiche WebLink
E'� ('t ��;' 1 <br /> �� <br /> Latter to Larry W. Ingrahami <br /> Ronald Gregory '— <br /> Nay 15� 19�5 <br /> Page 2 <br /> Except for item 4 above, the site may be daveloped Sn conformance with the <br /> siLe plan dated Nay 1 , 1985• However, the applicant must comply with all <br /> r.�nditions listed on the attached Declaration of Non-SigniPicance for SEPA <br /> f79-10'/ and xith all City ordinances and standards and specifications <br /> including the follouing: <br /> 1. Detailed drawings ir, accordance xlth city design and coustruc�.ion <br />,� standards shall be submittea to the Public ilorks Depart�ent <br />� s:oNin3 site parking layout, landscaping, utilities, storm <br />` drainage, teoporary construction erosion . control, and all <br /> required improvements !n the public right-of-uay. Yublic Horl:s <br /> Department approval o: these drawings is required prior to any <br /> perwits being issued. All impro�•ements shall be completed, <br /> approved, and warranted before the Oc�upancy Permit is issued. <br /> 2. Special charge:, for connection to seuer system in accordance Hitn <br /> Ordinance /964-63 are applicable. The actual cost shall be <br /> computed by the IIuilding Department per the ordinance in effect <br /> at the time and according to the information provided on the <br /> approved plans on the date of permit issuance. <br /> 3• On-site detention is required, OR, in lieu of providing on-site <br /> detention, payment to City Drainage Fund 340 is allowed per <br /> Ordinance i670-60. Drainage calculation must be submitted to the <br /> Public ilorks Deyartment to deteroine Lhe fee amount. <br /> 4. Parking must meet City Code and Design Standards. Compact stalls <br /> should not be installed adjacent to bus.inesses which do not meet <br /> Standards Deaign kequirment 1.12. <br /> 5• A fire hydrant is requlred withln 200 driving feet� but not <br /> closer than 50 feet of every structure per Ordinance #493-�8. <br /> 6. City streets ai•e to be kept clear oP dirt and debris at all times <br /> du^ing constructlon. Dust suppression and street cleaning must <br /> occur as directed by the Public Works Inspector. <br /> 7. A two-year guarantee is required for private retention/detention <br /> or other drainage treatment/abatement facilities serving areas <br /> .larger than one acre. <br /> 8. On-sitr water wain will be staked rrithin an <:asement to the <br /> City. The easement Will be submitted to th� City prior to <br /> is3uance of permits. <br /> L ' <br />