My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1000 SE EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1000
>
BASE FILE
>
1000 SE EVERETT MALL WAY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2019 8:19:18 AM
Creation date
2/13/2017 6:55:29 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1000
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Flan Check 17�2 <br /> Larry Callahan <br /> September 10, 1905 <br /> Page 7'wo <br /> 4. g. Design of fooings in ductile frames: The bending moments at the base <br /> of the columns, which are transmitted by the footings to the soil, are <br /> approximately equal for the full liv� load case and the no live load case. <br /> However, the moment arm (e) on the footing (i.e. e = M/P) increases <br /> for the de�d lod only condition and should be considered when calcu- <br /> lating tlie soil pressure. <br /> 5. b. Beam-column joints which ai e not within (and parallel to) the ductile <br /> frames: When only portions of the structural frame are ductile, P.20-C <br /> of the S�AOC Commentary stipuiates: "The larger displacements. . . <br /> (of ductile frames) must not jeopardize the vertical load capabilities of <br /> all oiiier load ca;ryiny elemen[s not part of tlie seismic 'resisting systern." <br /> O��r recommendation for a framin� member placed in both directions at <br /> every column is based on this. It ultimately shoulci be left to the dis- <br /> cretion of the engineer, but taking into account the SEAOC requir•ement. <br /> c. Beam-to-column con�ections in ductile frames: Mr. Griffir has referenced <br /> P.81-C of the SEAOC Commentary for desiyn of the conneciions. Note <br /> that P.87-C st�tes "a full penetration welded web connection. . .would <br /> develop somewhat greater ductility than the bolted web." UBC Section <br /> 2722(d) is more specific: '4�ach beam or girder moment connection to a <br /> column shall be capable of dee2loping in the beam the full plastic capa- <br /> city of the beam or girder" unless "it can be shown that adequtely duc- <br /> tile joint displacement capacity is provided with a lesser connection." <br /> The connection as detailed does not deve!op the plastic moment czpacity <br /> of the beam f�.e. area of flange times beam depth is only about 2/3 of <br /> the plastic section modulus) . The connection detail, therefore, requires <br /> justification to demonstrate that adequaYe ductile joint displacement is <br /> provided. <br /> d. Adequacyof doubler plates: The designer hz- indicated 50 Icsi stee;. <br /> The note at the bottom of the doubler plate schedule states "plates a�c <br /> ASTht A36 at columns." Some clarification of the drawings appears ap- <br /> propriate. <br /> 6. b. The details of the suspended ceiling will have to �e much more speci- <br /> ' fic to really assure :hat a 2 hour floor/ceiling assembly is achieved. <br /> Refer to Evaluation Report PFC 2896 and Architectural Section d/A-9. <br /> 7. c. Test data and yuality-control program for "Tat`trus" girders: For your <br /> information. <br /> 10. b,e,f. Design of skylights, canopies, suspended ceilings, curtain walls, <br /> etc. by manufacturer for wind pressures and lateral deflections: <br /> These should be submitted to }'ou prior to fabrication ior review. <br /> � . <br />
The URL can be used to link to this page
Your browser does not support the video tag.