My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1010 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1010
>
BASE FILE
>
1010 SE EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 11:30:09 AM
Creation date
2/13/2017 7:00:31 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1010
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ _ � _ j <br /> ��' Bob Landles� Planning Department �,/ <br /> F-.or.; p�blic Works DepartJnent ' %y� " � r'-� � � � � � " !� I Ii � <br /> OATE October 26� 1979 <br /> NOV - 'r 1979 J <br /> suo�ecr g,E.P.A. Cheek2ist Review N151 cirv oF evEa�i���ac(jj=w����,F�I��TT <br /> �� �07..�y Pianning urNt. <br /> PROPOSAL <br /> To construct a business park to consist of four office buildings <br /> (total gross square footage 175,372) south of South Broadway and <br /> west of Seattle-First Bank. <br /> RECOMMF•NDkTZ0175 � � <br /> It is the recommendation of the Yublic �Jorks Department that issuancc- <br /> of a Negative Declaration be subject to the folZowing: <br /> Z. A detailed drawing sha11 be subm.itted to ihe Public Works <br /> Department showing parking layo�•t� landscaping� driveways� <br /> storm drainage� and a11 required improvenents L-o the publi.c <br /> right-of-way. PubZic Wo*%cs Department approval of Lhese <br /> drawings is required before any,permits are issued. All. <br /> improvements sha22 be compizted hefore the Occupancy Pe:mit: <br /> is issued. <br /> 2., City streets are to be kepC clear of dirt and debr.i.s duxiny <br /> construction. <br /> 3. ,7uring construction a1Z truck traffic to and fr.om the sitc- � <br /> within the City of Everett shaZ1 be on arterial streets <br /> unless otherwise approved hy the YubZic 6Jorks Dcpartment. � <br /> 4. Covenant Power of Attorne� for street improvements i.o 100Lh ;Crec:ts <br /> to South Broadwa�� and to a future North-SouC:i L'OTJ:].�'UT <br /> from IOOth Street to South Broadway on tha aaster.n side <br /> of the proposed site by L.I.D. is requirc_d. <br /> 5. Participation in the program to fund the South l:nd �ani.tar.� <br /> Sewer Interceptor is required.. <br /> 6. AdditionaZ information �s reqaired to detezminc i��e adeguacy <br /> of water pressure for fire protection in the area. <br /> 7. On-site detention cri U� procis.ion for oil r.emoval i^ rnquirer7. <br /> Drainage caZcu2ations are to be svbmitted wiLh the ntLacl�eo' <br /> _ cover sheet. <br /> S. Putlic WorY.s DepartnenY approval of a temporarq em c��.-, <br /> controZ p2an is_ required nrinr t� w�;ui�encing site prcparat:ioli� <br /> y, fi 35 font strip of land on he eash porL-ion of subject <br /> site sha21 be provided in a .recorded docu,nent for U�e <br /> purpose of constructing a North-South corridor between <br /> 100th Street and Sou[h DIOd(IWu'y. Pfethod of prov.id5•:;1 cozra0or <br /> �ha11 be aF�provc.d hy City dttornay. . <br /> I <br /> � <br /> � <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.